Monroe, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Monroe GA (city utilities, inside city): water connection fee 1,235 (5/8 inch, new construction), water service tap 2,804 (long side; short side 1,839), sewer connection fee 8,670 (1 ERU) and sewer service tap 3,078 (long side; short side 2,317), from the city water and wastewater rate sheets effective Sep 11 2024 (stored from the 2025 rate PDFs); building permit 460 + 3 per $1,000 over $100,000 on the computed 380,268 valuation (1,303), 50% plan review and the 75 CO from the Code Department fee schedule (revised Nov 2021, the schedule the city posts). Impact fee note: Monroe posts no separate road/parks impact fee. NOT included: 50 sewer inspection fee, 65 residential garbage fee, trade permits, redevelopment rates, outside-city rates. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection fee, 5/8 inch meter, new construction (inside city) water | $1,235 5/8" meter, new construction | $1,235 | Printed Effective 2024-09-11 Source · Monroe GA Water Rates sheet, Water & Irrigation Meter Tap & Connection Fees (eff. Sep 11 2024), Water Connection Fees fetched 2026-11-09, sha256 315fe31d1b77 |
| Water service tap fee, 1.0 ERU meter (new construction) water · computed | $1,839 short side | $2,804 long side 20 gpm / 1.0 ERU, long side shown as the higher | $2,804 | Printed (long side, the higher) Effective 2024-09-11 Source · Monroe GA Water Rates sheet, Water & Irrigation Meter Tap & Connection Fees (eff. Sep 11 2024), Service Tap Fee fetched 2026-11-09, sha256 315fe31d1b77 |
| Sewer connection fee, residential (1 ERU = 300 gpd, inside city) sewer | $8,670 per residential ERU | $8,670 | Printed Effective 2024-09-11 Source · Monroe GA Wastewater Rates sheet, Tap & Connection Fees (eff. Sep 11 2024), Residential Connection Fee fetched 2026-11-09, sha256 cdfe37c7c548 |
| Sewer service tap fee, residential sewer · computed | $2,317 short side | $3,078 long side long side shown as the higher; owner pays connection fee plus service tap fee | $3,078 | Printed (long side, the higher) Effective 2024-09-11 Source · Monroe GA Wastewater Rates sheet, Tap & Connection Fees (eff. Sep 11 2024), Residential Service Tap Fee fetched 2026-11-09, sha256 cdfe37c7c548 |
| Building permit, $100,000.01 to $500,000.00 bracket permit · computed | $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof valuation $380,268 (ICC BVD convention); over 100,000 = 280.268 -> 281 thousands | $1,303 | 460 + 3 x 281 = 1303.00 Effective 2021-11-01 Source · Monroe GA Code Department Schedule of Fees (revised November 2021), 1. Building Permit Fees fetched 2026-11-09, sha256 c48d2bf337c7 |
| Plan review fee permit · computed | one half (1/2) the building permit fee 50% of the building permit fee | $651.50 | 0.5 x 1303.00 = 651.50 Effective 2021-11-01 Source · Monroe GA Code Department Schedule of Fees (revised November 2021), 2. Plan Review Fees fetched 2026-11-09, sha256 c48d2bf337c7 |
| Certificate of Occupancy permit | $75 per certificate | $75 | Printed Effective 2021-11-01 Source · Monroe GA Code Department Schedule of Fees (revised November 2021), Certificate of Occupancy fetched 2026-11-09, sha256 c48d2bf337c7 |
| Total listed | $17,816.50 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.