McDonough, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: McDonough GA: city impact fee 2,209.16 per single-family dwelling, 3/4 inch water connection 2,003.35, sewer connection 1,832.34 and recovery fee 255.00 (Water and Sewer Tap-On Application fee schedule; undated), and one/two-family building permit 0.30 per sq ft under roof on 2,400 sq ft = 720.00 (Appendix A, effective June 19 2023). The impact fee schedule and permit ordinance PDFs are image-only and were transcribed from the rendered pages (originals kept as .bak-empty). NOT included: applicable trade permits (75 minimum each), Henry County Water and Sewerage Authority charges if the lot is on HCWSA service (the commercial packet asks for HCWSA receipts), deposit 200, Henry County school fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Impact fee, single-family detached housing impact | $2,209.1600 per dwelling per dwelling | $2,209.16 | Printed Effective n/a Source · McDonough Impact Fee Schedule PDF (image-only, transcribed) fetched 2026-11-09, sha256 b585e48d07c2 |
| Water connection fee, 3/4 inch meter water | $2,003.35 3/4 inch meter | $2,003.35 | Printed Effective n/a Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Water Connection Only fetched 2026-11-09, sha256 bedf60a305a3 |
| Sewer connection fee, 3/4 inch meter sewer | $1,832.34 3/4 inch meter | $1,832.34 | Printed Effective n/a Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Sewer Connection Only fetched 2026-11-09, sha256 bedf60a305a3 |
| Recovery fee, 3/4 inch meter water | $255.00 3/4 inch meter | $255 | Printed Effective n/a Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Recovery fee fetched 2026-11-09, sha256 bedf60a305a3 |
| Building permit, one and two-family new construction permit · computed | $0.30 per sq. ft. total square footage (under roof); minimum $300.00 2,400 sq ft under roof (2,000 heated + 400 garage) | $720 | 0.30 x 2,400 = 720.00 Effective 2023-06-19 Source · McDonough Appendix A Schedule of Permit Fees (Ordinance 23-09-18, effective June 19 2023), A. Building Permits: One and Two-Family Residential fetched 2026-11-09, sha256 b65dad6dc431 |
| Total listed | $7,019.85 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.