Padstake
Menu

McDonough, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$7,019.85listed total
Nonerank by 2025 new single-family permits

Not included: McDonough GA: city impact fee 2,209.16 per single-family dwelling, 3/4 inch water connection 2,003.35, sewer connection 1,832.34 and recovery fee 255.00 (Water and Sewer Tap-On Application fee schedule; undated), and one/two-family building permit 0.30 per sq ft under roof on 2,400 sq ft = 720.00 (Appendix A, effective June 19 2023). The impact fee schedule and permit ordinance PDFs are image-only and were transcribed from the rendered pages (originals kept as .bak-empty). NOT included: applicable trade permits (75 minimum each), Henry County Water and Sewerage Authority charges if the lot is on HCWSA service (the commercial packet asks for HCWSA receipts), deposit 200, Henry County school fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Impact fee, single-family detached housing
impact
$2,209.1600 per dwelling
per dwelling
$2,209.16Printed
Effective n/a
Source · McDonough Impact Fee Schedule PDF (image-only, transcribed)
fetched 2026-11-09, sha256 b585e48d07c2
Water connection fee, 3/4 inch meter
water
$2,003.35
3/4 inch meter
$2,003.35Printed
Effective n/a
Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Water Connection Only
fetched 2026-11-09, sha256 bedf60a305a3
Sewer connection fee, 3/4 inch meter
sewer
$1,832.34
3/4 inch meter
$1,832.34Printed
Effective n/a
Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Sewer Connection Only
fetched 2026-11-09, sha256 bedf60a305a3
Recovery fee, 3/4 inch meter
water
$255.00
3/4 inch meter
$255Printed
Effective n/a
Source · McDonough Water and Sewer Tap-On Application and Fee Schedule, Capital Recovery Fee Worksheet, 3/4 inch, Recovery fee
fetched 2026-11-09, sha256 bedf60a305a3
Building permit, one and two-family new construction
permit · computed
$0.30 per sq. ft. total square footage (under roof); minimum $300.00
2,400 sq ft under roof (2,000 heated + 400 garage)
$7200.30 x 2,400 = 720.00
Effective 2023-06-19
Source · McDonough Appendix A Schedule of Permit Fees (Ordinance 23-09-18, effective June 19 2023), A. Building Permits: One and Two-Family Residential
fetched 2026-11-09, sha256 b65dad6dc431
Total listed$7,019.85

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.