Marietta, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Marietta GA: water meter with tap 3/4 inch 1,500, sewer development fee 3,500 and 6 inch sewer tap 2,500 (Marietta Water page, effective Jan 1 2022, still the posted one), residential building permit $5 per $1,000 + $50 base on the computed $380,268 valuation (381 x 5 + 50 = 1,955). City Fee Chart (stored) lists impact fees as N/A for residential permits. NOT included: plumbing/electrical/mechanical permits ($50 each), separate water development fee (none posted), Cobb County/school fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water meter with tap, 3/4 inch domestic water | $1,500 per 3/4 inch domestic meter with tap | $1,500 | Printed Effective 2022-01-01 Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Domestic & Irrigation Meters (With Tap) fetched 2026-11-09, sha256 9c4ace55829c |
| Sewer development fee (SDF), residential sewer | $3,500 per residential service | $3,500 | Printed Effective 2022-01-01 Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Residential Sanitary Sewer Service fetched 2026-11-09, sha256 9c4ace55829c |
| Sewer tap installation, 6 inch sewer | $2,500 per tap | $2,500 | Printed Effective 2022-01-01 Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Residential Sanitary Sewer Service fetched 2026-11-09, sha256 9c4ace55829c |
| Residential building permit permit · computed | $5 per $1000 of construction cost plus $50 base fee, no plan review fee valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400), each $1,000 or fraction | $1,955 | 381 x 5 + 50 = 1,955.00 Effective n/a Source · Building Permits page, Permit Fee Schedule: Residential fetched 2026-11-09, sha256 22dbef5a9dbf |
| Total listed | $9,455 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.