Padstake
Menu

Marietta, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$9,455listed total
Nonerank by 2025 new single-family permits

Not included: Marietta GA: water meter with tap 3/4 inch 1,500, sewer development fee 3,500 and 6 inch sewer tap 2,500 (Marietta Water page, effective Jan 1 2022, still the posted one), residential building permit $5 per $1,000 + $50 base on the computed $380,268 valuation (381 x 5 + 50 = 1,955). City Fee Chart (stored) lists impact fees as N/A for residential permits. NOT included: plumbing/electrical/mechanical permits ($50 each), separate water development fee (none posted), Cobb County/school fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water meter with tap, 3/4 inch domestic
water
$1,500
per 3/4 inch domestic meter with tap
$1,500Printed
Effective 2022-01-01
Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Domestic & Irrigation Meters (With Tap)
fetched 2026-11-09, sha256 9c4ace55829c
Sewer development fee (SDF), residential
sewer
$3,500
per residential service
$3,500Printed
Effective 2022-01-01
Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Residential Sanitary Sewer Service
fetched 2026-11-09, sha256 9c4ace55829c
Sewer tap installation, 6 inch
sewer
$2,500
per tap
$2,500Printed
Effective 2022-01-01
Source · Marietta Water Meter & Wastewater Tap Fees page (effective Jan 1 2022), Residential Sanitary Sewer Service
fetched 2026-11-09, sha256 9c4ace55829c
Residential building permit
permit · computed
$5 per $1000 of construction cost plus $50 base fee, no plan review fee
valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400), each $1,000 or fraction
$1,955381 x 5 + 50 = 1,955.00
Effective n/a
Source · Building Permits page, Permit Fee Schedule: Residential
fetched 2026-11-09, sha256 22dbef5a9dbf
Total listed$9,455

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.