Hoschton, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Hoschton GA: park/open space and police impact fees plus the 3% admin fee ($1,779.38 total) from Ordinance 2023-02 (page read visually and transcribed into the stored text), water ($4,600) and sewer ($8,800) connection fees for a 3/4-inch meter (adopted 12/2024), and the May 14 2026 building permit schedule (finished $0.85 and unfinished $0.40 per sq ft, 50% plan review, CO $200, three $100 trade permits assumed). The impact fee schedule is the applicant option under the ordinance (alternative: individual assessment). NOT included: sewer capacity certification program, lift station maintenance fees, meter/tap installation, zoning fees, Jackson County school or other fees. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Park/open space impact fee, per dwelling unit parks | 935.59 per dwelling unit (other than age-restricted and townhome) | $935.59 | Printed Effective 2023-04-13 Source · City of Hoschton Ordinance No. 2023-02 (amending O-20-06), Section 7(A) Residential Development Impact Fee Schedule per dwelling unit fetched 2026-11-09, sha256 00c8c233fae7 |
| Police impact fee, per dwelling unit police | 791.96 per dwelling unit (other than age-restricted and townhome) | $791.96 | Printed Effective 2023-04-13 Source · City of Hoschton Ordinance No. 2023-02 (amending O-20-06), Section 7(A) Residential Development Impact Fee Schedule per dwelling unit fetched 2026-11-09, sha256 00c8c233fae7 |
| Impact fee administration fee (3%) impact | 51.83 per dwelling unit | $51.83 | Printed Effective 2023-04-13 Source · City of Hoschton Ordinance No. 2023-02 (amending O-20-06), Section 7(A) Residential Development Impact Fee Schedule per dwelling unit fetched 2026-11-09, sha256 00c8c233fae7 |
| Water connection fee, 3/4 inch meter water | $4,600.00 per 3/4 inch meter (20 gpm) | $4,600 | Printed Effective 2024-12-17 Source · City of Hoschton Connection Fees (Adopted 12/2024), 3/4 inch meter fetched 2026-11-09, sha256 afb23e76043c |
| Sewer connection fee, 3/4 inch meter sewer | $8,800.00 per water meter size, 3/4 inch | $8,800 | Printed Effective 2024-12-17 Source · City of Hoschton Connection Fees (Adopted 12/2024), 3/4 inch meter fetched 2026-11-09, sha256 afb23e76043c |
| Building permit, finished area permit · computed | $0.85 per square foot per sq ft finished area, minimum fee $400.00 | $1,700 | $0.85 x 2,000 sq ft = 1,700.00 Effective 2026-05-14 Source · Building Permit Fees - City of Hoschton, Georgia (adopted 5.14.2026) fetched 2026-11-09, sha256 5d4f19d5b901 |
| Building permit, unfinished area (garage) permit · computed | $0.40 per square foot per sq ft unfinished area | $160 | $0.40 x 400 sq ft = 160.00 Effective 2026-05-14 Source · Building Permit Fees - City of Hoschton, Georgia (adopted 5.14.2026) fetched 2026-11-09, sha256 5d4f19d5b901 |
| Plan review, new single-family residential permit · computed | Additional 50% of permit fee percent of permit fee | $930 | 50% x (1,700 + 160) = 930.00 Effective 2026-05-14 Source · Building Permit Fees - City of Hoschton, Georgia (adopted 5.14.2026) fetched 2026-11-09, sha256 5d4f19d5b901 |
| Certificate of occupancy, new single-family detached permit | $200.00 per dwelling | $200 | Printed Effective 2026-05-14 Source · Building Permit Fees - City of Hoschton, Georgia (adopted 5.14.2026) fetched 2026-11-09, sha256 5d4f19d5b901 |
| Residential trade permits (electrical, plumbing, mechanical) permit · computed | $100.00 per Permit per permit, 3 permits assumed | $300 | $100.00 x 3 = 300.00 Effective 2026-05-14 Source · Building Permit Fees - City of Hoschton, Georgia (adopted 5.14.2026) fetched 2026-11-09, sha256 5d4f19d5b901 |
| Total listed | $18,469.38 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.