Gwinnett County Unincorporated Area, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Water and sewer: Gwinnett County Water Resources January 2026 schedule, 3/4-inch meter, new connection. Building permit: $4 per $1,000 on computed valuation $380,268 (includes plan review and inspections), schedule effective Aug 25, 2026. No county development impact fee for single-family homes appears in the Gwinnett County fee documents read (planning/building fee schedule, water resources schedule), so none is listed. Not included: $550 mainline sewer tap (only where no tap exists; paid with the SDC in new developments), 1-inch meter if the home needs one (water SDC $3,610, sewer $13,270 for 1 inch), certificate of occupancy fee, city-limit parcels (Lawrenceville, Duluth etc. have their own schedules). Staged 2026-11-09.
Water/sewer provider: Gwinnett County Water Resources
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development charge water | $1,128.00 per new single-family connection, 3/4" meter | $1,128 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Sewer system development charge sewer | $4,147.00 per new single-family connection, 3/4" meter | $4,147 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Meter fee (new meter, includes installation) water | $1,397.00 per new single-family connection, 3/4" meter | $1,397 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Account activation fee water | $25.00 per new single-family connection, 3/4" meter | $25 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Water setup admin fee water | $25.00 per new single-family connection, 3/4" meter | $25 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Sewer setup admin fee sewer | $25.00 per new single-family connection, 3/4" meter | $25 | Printed Effective 2026-01-01 Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter fetched 2026-11-08, sha256 d5ac69d53af9 |
| Building permit (includes plan review and inspections) permit · computed | $4 per $1,000 of estimated construction cost percent of valuation | $1,521.07 | Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft) x 0.004 = 1,521.07 Effective 2026-08-25 Source · Building Permit Fees (Effective August 25, 2026), New Construction fetched 2026-11-08, sha256 32160907b9a8 |
| Total listed | $8,268.07 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.