Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$8,268.07listed total
Nonerank by 2025 new single-family permits

Not included: Water and sewer: Gwinnett County Water Resources January 2026 schedule, 3/4-inch meter, new connection. Building permit: $4 per $1,000 on computed valuation $380,268 (includes plan review and inspections), schedule effective Aug 25, 2026. No county development impact fee for single-family homes appears in the Gwinnett County fee documents read (planning/building fee schedule, water resources schedule), so none is listed. Not included: $550 mainline sewer tap (only where no tap exists; paid with the SDC in new developments), 1-inch meter if the home needs one (water SDC $3,610, sewer $13,270 for 1 inch), certificate of occupancy fee, city-limit parcels (Lawrenceville, Duluth etc. have their own schedules). Staged 2026-11-09.

Water/sewer provider: Gwinnett County Water Resources

LinePrinted ratePrototypeReceipt
Water system development charge
water
$1,128.00
per new single-family connection, 3/4" meter
$1,128Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Sewer system development charge
sewer
$4,147.00
per new single-family connection, 3/4" meter
$4,147Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Meter fee (new meter, includes installation)
water
$1,397.00
per new single-family connection, 3/4" meter
$1,397Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Account activation fee
water
$25.00
per new single-family connection, 3/4" meter
$25Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Water setup admin fee
water
$25.00
per new single-family connection, 3/4" meter
$25Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Sewer setup admin fee
sewer
$25.00
per new single-family connection, 3/4" meter
$25Printed
Effective 2026-01-01
Source · DWR Rates and Fee Schedule January 2026, Residential Accounts - New Meter and System Development Charge Fees, 3/4" meter
fetched 2026-11-08, sha256 d5ac69d53af9
Building permit (includes plan review and inspections)
permit · computed
$4 per $1,000 of estimated construction cost
percent of valuation
$1,521.07Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft) x 0.004 = 1,521.07
Effective 2026-08-25
Source · Building Permit Fees (Effective August 25, 2026), New Construction
fetched 2026-11-08, sha256 32160907b9a8
Total listed$8,268.07

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.