Forsyth County Unincorporated Area, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees from the county 2027 land use table effective Oct 5, 2026 (roads, parks, library, public safety). Permit lines: county Building & Licensing fee schedule, using the schedule's own valuation rule ($50 per heated sq ft, $12.50 per unheated sq ft) - not the ICC valuation used elsewhere; three trade permits at $50 each; lot grading plan $250. NOT included: water and sewer tap/capacity fees (Forsyth County Water & Sewer posts no fee amounts on its web pages; the City of Cumming runs its own utility), so this page never shows a total. Plan review fee for residential not listed. Staged 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Roads impact fee
impact
$7,453
per single-family detached dwelling
$7,453Printed (sheet total printed as $9,513; components sum to $9,514 by rounding)
Effective 2026-10-05
Source · Impact Fees for Development Permits (2027 Impact Fee Schedule, Land Use Table), effective 10/5/2026, Single-Family Detached
fetched 2026-11-09, sha256 cf6f62a7cc70
Parks impact fee
impact
$1,322
per single-family detached dwelling
$1,322Printed (sheet total printed as $9,513; components sum to $9,514 by rounding)
Effective 2026-10-05
Source · Impact Fees for Development Permits (2027 Impact Fee Schedule, Land Use Table), effective 10/5/2026, Single-Family Detached
fetched 2026-11-09, sha256 cf6f62a7cc70
Library impact fee
impact
$166
per single-family detached dwelling
$166Printed (sheet total printed as $9,513; components sum to $9,514 by rounding)
Effective 2026-10-05
Source · Impact Fees for Development Permits (2027 Impact Fee Schedule, Land Use Table), effective 10/5/2026, Single-Family Detached
fetched 2026-11-09, sha256 cf6f62a7cc70
Public safety impact fee
impact
$573
per single-family detached dwelling
$573Printed (sheet total printed as $9,513; components sum to $9,514 by rounding)
Effective 2026-10-05
Source · Impact Fees for Development Permits (2027 Impact Fee Schedule, Land Use Table), effective 10/5/2026, Single-Family Detached
fetched 2026-11-09, sha256 cf6f62a7cc70
Building permit (valuation-based)
permit · computed
$575 for the first $100,000 plus $3.75 for each additional thousand or fraction thereof
percent of valuation
$593.75County valuation rule: heated 2,000 sq ft x $50 = 100,000 plus unheated (garage) 400 sq ft x $12.50 = 5,000; total 105,000; $575 + 5 x $3.75 = 593.75
Effective 2026-11-09
Source · Forsyth County Building & Licensing Fee Schedule, Building Permits, Non-Commercial
fetched 2026-11-09, sha256 4da6936d2cdc
Residential HVAC, plumbing and electrical permits (3 trades)
permit · computed
$50 per trade for 1,001 - 2,000 sq ft
per trade
$1503 trades x $50 = 150.00
Effective 2026-11-09
Source · Forsyth County Building & Licensing Fee Schedule, Building Permits, Non-Commercial
fetched 2026-11-09, sha256 4da6936d2cdc
Lot grading plan
permit
$250 per lot
per lot
$250Printed
Effective 2026-11-09
Source · Forsyth County Building & Licensing Fee Schedule, Building Permits, Non-Commercial
fetched 2026-11-09, sha256 4da6936d2cdc

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.