Flowery Branch, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Flowery Branch GA: residential building permit components from the FY2026 Master Fee Schedule (S&I inspection 2,000, building inspection 2,000, review 1,000 = 5,000) and the Hall County impact fee 1,241.93 listed on the same row. NOT included / not found: the city Water and Wastewater Development Charges & Service Fees (city documents page returned 403 to the fetcher and the attachment was not located), trade permits ($50 each), school impact fee, Hall County water/sewer where applicable. Page never shows a total. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Residential building permit: S&I (site and infrastructure) inspection fee permit | $2,000.00 per new residential building permit | $2,000 | Printed Effective n/a Source · City of Flowery Branch Master Fee Schedule FY2026, Planning, Residential Building Permit fetched 2026-11-09, sha256 2426178cca72 |
| Residential building permit: building inspection fee permit | $2,000.00 per new residential building permit | $2,000 | Printed Effective n/a Source · City of Flowery Branch Master Fee Schedule FY2026, Planning, Residential Building Permit fetched 2026-11-09, sha256 2426178cca72 |
| Residential building permit: review fee permit | $1,000.00 per new residential building permit | $1,000 | Printed Effective n/a Source · City of Flowery Branch Master Fee Schedule FY2026, Planning, Residential Building Permit fetched 2026-11-09, sha256 2426178cca72 |
| Hall County impact fee (collected with the residential building permit) impact | $1,241.93 per new residential building permit | $1,241.93 | Printed Effective n/a Source · City of Flowery Branch Master Fee Schedule FY2026, Planning, Residential Building Permit fetched 2026-11-09, sha256 2426178cca72 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.