Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. Emerson GA: readiness to serve (capacity) fees for a 5/8 x 3/4 inch meter, water 4,425 (Moss Spring service; 1,700 on purchased water) and sewer 8,850 (HJWWTP; 3,425 Red Top Sewer), the higher printed service area shown on each line, from the FY27 Water and Sewer Utility Fees; building permit from the FY27 Building Permit Fees on the city method (residential valuation on heated sq ft: 2,000 x 175.92 = 351,840) = 2,404.95, plus 50 administrative, 200 plan review and 500 CO. MISSING: water and sewer tap fees (cost plus 18%, not posted). NOT included: Bartow County and City of Cartersville fees (the schedule says readiness fees exclude them), 10% single-family inspection fee line, trade permits, deposits 100. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water readiness to serve fee, 5/8 x 3/4 inch meter
water · computed
$4,425 Moss Spring | $1,700 Purchase Water
5/8 x 3/4 inch meter; Moss Spring service area shown (the higher)
$4,425Printed (Moss Spring, the higher)
Effective 2026-07-01
Source · Emerson Water and Sewer Utility Fees FY27 (Fiscal Year 2027 Operating Budget Ordinance 2026-009), Readiness To Serve Fees, 5/8 x 3/4", Water
fetched 2026-11-09, sha256 c5a8320bcc13
Sewer readiness to serve fee, 5/8 x 3/4 inch meter
sewer · computed
$8,850 HJWWTP | $3,425 Red Top Sewer
5/8 x 3/4 inch meter; HJWWTP service area shown (the higher)
$8,850Printed (HJWWTP, the higher)
Effective 2026-07-01
Source · Emerson Water and Sewer Utility Fees FY27 (Fiscal Year 2027 Operating Budget Ordinance 2026-009), Readiness To Serve Fees, 5/8 x 3/4", Sewer
fetched 2026-11-09, sha256 c5a8320bcc13
Building permit, $100,001.00 to $500,000.00 bracket
permit · computed
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction
valuation = 2,000 sq ft heated x ICC R-3 V-B 175.92 = 351,840.0 (city: residential calculated on heated square footage); over 100,000 = 251.84 -> 252 thousands
$2,404.95993.75 + 5.60 x 252 = 2404.95
Effective 2026-07-01
Source · Emerson Building Permit Fees FY27, Permit Fees
fetched 2026-11-09, sha256 dc54eeba52c0
Administrative fee
permit
$50
per permit
$50Printed
Effective 2026-07-01
Source · Emerson Building Permit Fees FY27, Administrative Fee
fetched 2026-11-09, sha256 dc54eeba52c0
Building plan review fee
permit
$200
per plan review
$200Printed
Effective 2026-07-01
Source · Emerson Building Permit Fees FY27, Building Plan Review Fee
fetched 2026-11-09, sha256 dc54eeba52c0
Residential certificate of occupancy
permit
$500
per residential CO
$500Printed
Effective 2026-07-01
Source · Emerson Building Permit Fees FY27, Residential Certificate of Occupancy
fetched 2026-11-09, sha256 dc54eeba52c0

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199