Douglasville, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Douglasville GA (Douglasville-Douglas County Water and Sewer Authority): water tap-on ($1,250), installation/construction cost ($650), $25 application fee, sewer tap-on ($4,500) and sewer inspection ($100) for a 5/8-inch meter from the Rates and Impact Fee Chart effective December 1 2025 (the chart page was read visually; 3/4-inch meters pay $1,875 and $6,750). NOT included: refundable deposits ($50 water, $75 sewer), city building permit and impact fee schedules (not found), stormwater fee. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee tap-on fee, 5/8 inch water | 1,250.00 per 5/8 inch meter (3/4 inch: 1,875.00) | $1,250 | Printed (5/8 inch meter; 3/4 inch is higher) Effective 2025-12-01 Source · DDCWSA Water and Sewer Rates and Charges, Rates and Impact Fee Chart effective December 1, 2025, 5/8 inch meter, Water Impact Fees fetched 2026-11-09, sha256 4bfb63913da5 |
| Water installation/construction cost, 5/8 inch water | 650.00 per 5/8 inch standard connection (3/4 inch: 700.00) | $650 | Printed (5/8 inch meter; 3/4 inch is higher) Effective 2025-12-01 Source · DDCWSA Water and Sewer Rates and Charges, Rates and Impact Fee Chart effective December 1, 2025, 5/8 inch meter, Water Impact Fees fetched 2026-11-09, sha256 4bfb63913da5 |
| Application fee water | $25.00 per new account | $25 | Printed (5/8 inch meter; 3/4 inch is higher) Effective 2025-12-01 Source · DDCWSA Water and Sewer Rates and Charges, Rates and Impact Fee Chart effective December 1, 2025, 5/8 inch meter, Water Impact Fees fetched 2026-11-09, sha256 4bfb63913da5 |
| Sewer impact fee tap-on fee, 5/8 inch sewer | 4,500.00 per 5/8 inch meter (3/4 inch: 6,750.00) | $4,500 | Printed (5/8 inch meter; 3/4 inch is higher) Effective 2025-12-01 Source · DDCWSA Water and Sewer Rates and Charges, Rates and Impact Fee Chart effective December 1, 2025, 5/8 inch meter, Sewer Impact Fees fetched 2026-11-09, sha256 4bfb63913da5 |
| Sewer inspection fee sewer | 100.00 per sewer connection | $100 | Printed (5/8 inch meter; 3/4 inch is higher) Effective 2025-12-01 Source · DDCWSA Water and Sewer Rates and Charges, Rates and Impact Fee Chart effective December 1, 2025, 5/8 inch meter, Sewer Impact Fees fetched 2026-11-09, sha256 4bfb63913da5 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.