Padstake
Menu

DeKalb County Unincorporated Area, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. DeKalb County 2026 building permit schedule (ICC valuation x 0.0065 on computed valuation $380,268, $20 technology fee, $50 CO) and the Watershed single-family water and sewer access fee $1,811.93 per house. No county impact fee found in the DeKalb documents. NOT included: water meter/tap and sewer tap installation fees (Watershed misc-fee resolution not read), sewer capacity evaluation, grading/development permit and engineering review fees, trade permits, City of Atlanta/Decatur-area parcels. The page text lists the technology fee as both "100% of permit fee" and "$20"; $20 is used because the minimum-fee line says $20 is additional. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water and sewer access fee, single-family residential
water
$1,811.93/house
per house
$1,811.93Printed
Effective 2026-06-08
Source · DeKalb County Building Permit Fee Schedule (6/8/2026), Water and Sewer Access Fee Schedule
fetched 2026-11-09, sha256 64214ff07a34
Building permit, new construction (ICC valuation x 0.0065)
permit · computed
$6.50 per $1,000 of ICC construction cost (minimum $175)
percent of valuation
$2,471.74Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft) x 0.0065 = 2,471.74
Effective 2026-06-08
Source · DeKalb County Building Permit Fee Schedule (6/8/2026), Building Permit, New Construction - All Types
fetched 2026-11-09, sha256 64214ff07a34
Technology fee
permit
$20 per permit
per permit
$20Printed
Effective 2026-06-08
Source · DeKalb County Building Permit Fee Schedule (6/8/2026)
fetched 2026-11-09, sha256 64214ff07a34
Certificate of occupancy fee
permit
$50
flat
$50Printed
Effective 2026-06-08
Source · DeKalb County Building Permit Fee Schedule (6/8/2026), Other Fees
fetched 2026-11-09, sha256 64214ff07a34

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.