Dallas, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Dallas GA: water tap service fee 1,500 + tap installation 1,000 + 5/8 inch meter and MXU 400 (three separate printed lines), residential sewer tap 4,100 (inside-city rates; outside-city 2,500 / 5,100 shown), building permit 5.00 per $1,000 on computed valuation $380,268 (381 thousands), plan review 25%, admin fee $30, certificate of occupancy $50, from the City of Dallas Schedule of Fees 8.2026. Dallas posts no city impact fee. NOT included: electrical, plumbing, HVAC and gas trade permits (residential rate tables are on later pages, not read), garage/carport per-1,000-sq-ft fee (valuation already includes the garage), Paulding County fees, deposits. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap service fee, residential inside city water | $1,500.00 inside | $2,500.00 outside per tap | $1,500 | Printed (inside city) Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees fetched 2026-11-09, sha256 05ded063c3ed |
| Water tap installation, 5/8 inch residential inside city water | $1,000.00 per tap (separate printed line) | $1,000 | Printed Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees fetched 2026-11-09, sha256 05ded063c3ed |
| Meter and MXU fee, 5/8 inch meter water | $400.00 per meter | $400 | Printed Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees fetched 2026-11-09, sha256 05ded063c3ed |
| Sewer tap, residential inside city sewer | $4,100.00 inside | $5,100.00 outside per tap | $4,100 | Printed (inside city) Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.16 Sewer Tap Fees fetched 2026-11-09, sha256 05ded063c3ed |
| Building permit, single family master permit (valuation table) permit · computed | $5.00 per $1,000.00 or portion thereof ($300,001 to $400,000 tier) valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400), rounded up to 381 thousands | $1,905 | 5.00 x 381 = 1,905.00 Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.2 Residential & Commercial Permit Fees (Building Only) fetched 2026-11-09, sha256 05ded063c3ed |
| Building plan review, residential permit · computed | 25% of the permit fee (min. $200.00) percent of building permit fee | $476.25 | 25% x 1,905.00 = 476.25 Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.4 Building Plan Review Fee fetched 2026-11-09, sha256 05ded063c3ed |
| Permit review fee (admin fee) permit | $30 per permit | $30 | Printed Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.4 Permit Review Fee (Admin Fee) fetched 2026-11-09, sha256 05ded063c3ed |
| Certificate of occupancy permit | $50.00 per certificate | $50 | Printed Effective n/a Source · City of Dallas Schedule of Fees 8.2026, p.4 Certificate of Occupancy fetched 2026-11-09, sha256 05ded063c3ed |
| Total listed | $9,461.25 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.