Dallas, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$9,461.25listed total
Nonerank by 2025 new single-family permits

Not included: Dallas GA: water tap service fee 1,500 + tap installation 1,000 + 5/8 inch meter and MXU 400 (three separate printed lines), residential sewer tap 4,100 (inside-city rates; outside-city 2,500 / 5,100 shown), building permit 5.00 per $1,000 on computed valuation $380,268 (381 thousands), plan review 25%, admin fee $30, certificate of occupancy $50, from the City of Dallas Schedule of Fees 8.2026. Dallas posts no city impact fee. NOT included: electrical, plumbing, HVAC and gas trade permits (residential rate tables are on later pages, not read), garage/carport per-1,000-sq-ft fee (valuation already includes the garage), Paulding County fees, deposits. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water tap service fee, residential inside city
water
$1,500.00 inside | $2,500.00 outside
per tap
$1,500Printed (inside city)
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees
fetched 2026-11-09, sha256 05ded063c3ed
Water tap installation, 5/8 inch residential inside city
water
$1,000.00
per tap (separate printed line)
$1,000Printed
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees
fetched 2026-11-09, sha256 05ded063c3ed
Meter and MXU fee, 5/8 inch meter
water
$400.00
per meter
$400Printed
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.15 Water Tap Fees
fetched 2026-11-09, sha256 05ded063c3ed
Sewer tap, residential inside city
sewer
$4,100.00 inside | $5,100.00 outside
per tap
$4,100Printed (inside city)
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.16 Sewer Tap Fees
fetched 2026-11-09, sha256 05ded063c3ed
Building permit, single family master permit (valuation table)
permit · computed
$5.00 per $1,000.00 or portion thereof ($300,001 to $400,000 tier)
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400), rounded up to 381 thousands
$1,9055.00 x 381 = 1,905.00
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.2 Residential & Commercial Permit Fees (Building Only)
fetched 2026-11-09, sha256 05ded063c3ed
Building plan review, residential
permit · computed
25% of the permit fee (min. $200.00)
percent of building permit fee
$476.2525% x 1,905.00 = 476.25
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.4 Building Plan Review Fee
fetched 2026-11-09, sha256 05ded063c3ed
Permit review fee (admin fee)
permit
$30
per permit
$30Printed
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.4 Permit Review Fee (Admin Fee)
fetched 2026-11-09, sha256 05ded063c3ed
Certificate of occupancy
permit
$50.00
per certificate
$50Printed
Effective n/a
Source · City of Dallas Schedule of Fees 8.2026, p.4 Certificate of Occupancy
fetched 2026-11-09, sha256 05ded063c3ed
Total listed$9,461.25

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.