Dahlonega, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. CONNECTION FEES VERIFIED ONLY, no total. Dahlonega GA: water tapping fee 4,780 (3/4 inch, includes meter and backflow valve) and sewer tapping fee 5,975 (3/4 inch) from the city Utility Rates and Policies brochure effective Nov 1 2025 (brochure says information only, rates subject to change). Older budgets state the city has no impact fees; no impact fee schedule found. MISSING: building permit fees (not found on the city site by search). NOT included: road bore surcharge 4,000 each if boring under a road, account establishment fee 25, inspection fees per linear foot, Lumpkin County fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tapping fee, 3/4 inch meter (includes meter and backflow valve) water | $4,780 3/4 inch meter | $4,780 | Printed Effective 2025-11-01 Source · Dahlonega Utility Rates and Policies brochure (effective Nov 1 2025), Water Tapping Fees fetched 2026-11-09, sha256 b182e7134d89 |
| Sewer tapping fee, 3/4 inch meter (based on water meter size) sewer | $5,975.00 3/4 inch meter | $5,975 | Printed Effective 2025-11-01 Source · Dahlonega Utility Rates and Policies brochure (effective Nov 1 2025), Sewer Tapping Fees fetched 2026-11-09, sha256 b182e7134d89 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.