Padstake
Menu

Dahlonega, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. CONNECTION FEES VERIFIED ONLY, no total. Dahlonega GA: water tapping fee 4,780 (3/4 inch, includes meter and backflow valve) and sewer tapping fee 5,975 (3/4 inch) from the city Utility Rates and Policies brochure effective Nov 1 2025 (brochure says information only, rates subject to change). Older budgets state the city has no impact fees; no impact fee schedule found. MISSING: building permit fees (not found on the city site by search). NOT included: road bore surcharge 4,000 each if boring under a road, account establishment fee 25, inspection fees per linear foot, Lumpkin County fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water tapping fee, 3/4 inch meter (includes meter and backflow valve)
water
$4,780
3/4 inch meter
$4,780Printed
Effective 2025-11-01
Source · Dahlonega Utility Rates and Policies brochure (effective Nov 1 2025), Water Tapping Fees
fetched 2026-11-09, sha256 b182e7134d89
Sewer tapping fee, 3/4 inch meter (based on water meter size)
sewer
$5,975.00
3/4 inch meter
$5,975Printed
Effective 2025-11-01
Source · Dahlonega Utility Rates and Policies brochure (effective Nov 1 2025), Sewer Tapping Fees
fetched 2026-11-09, sha256 b182e7134d89

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.