Centerville, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. CONNECTION FEES VERIFIED ONLY, no total. Centerville GA: water connection (tap-on) 3/4 inch 2,600 (5,100 behind the Houston County master meter, shown as the headline per the highest-area rule), sewer connection 4 inch 2,850 and sewer inspection 30, from Ordinance 2026-2 (04/21/2026 rates). The same ordinance raises them on Jan 1 2027 (water 3,600 / 7,100, sewer 5,450) and Jan 1 2028. MISSING: building permit fees (the city construction permit application fee table not retrieved). NOT included: deposit 200, cut-on 45, meter charges, Houston County fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water connection (tap-on) fee, 3/4 inch (04/21/2026 rates)
water · computed
$2,600.00 | $5,100.00 if bulk water is purchased from Houston Co. (behind master meter); 01/01/2027 rates $3,600.00 | $7,100.00
3/4 inch; behind-master-meter area shown as the higher
$5,100Printed (behind master meter, the higher)
Effective 2026-04-21
Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, 04/21/2026 RATES - WATER CONNECTION
fetched 2026-11-09, sha256 b11066b61ccc
Sewer connection (tap-on) fee, 4 inch (04/21/2026 rates)
sewer
$2,850.00 (01/01/2027 rates $5,450.00)
4 inch
$2,850Printed
Effective 2026-04-21
Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, 04/21/2026 RATES - SEWER CONNECTION
fetched 2026-11-09, sha256 b11066b61ccc
Sewer inspection
sewer
$30.00
per inspection
$30Printed
Effective 2026-04-21
Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, Misc. Sewer
fetched 2026-11-09, sha256 b11066b61ccc

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.