Centerville, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. CONNECTION FEES VERIFIED ONLY, no total. Centerville GA: water connection (tap-on) 3/4 inch 2,600 (5,100 behind the Houston County master meter, shown as the headline per the highest-area rule), sewer connection 4 inch 2,850 and sewer inspection 30, from Ordinance 2026-2 (04/21/2026 rates). The same ordinance raises them on Jan 1 2027 (water 3,600 / 7,100, sewer 5,450) and Jan 1 2028. MISSING: building permit fees (the city construction permit application fee table not retrieved). NOT included: deposit 200, cut-on 45, meter charges, Houston County fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection (tap-on) fee, 3/4 inch (04/21/2026 rates) water · computed | $2,600.00 | $5,100.00 if bulk water is purchased from Houston Co. (behind master meter); 01/01/2027 rates $3,600.00 | $7,100.00 3/4 inch; behind-master-meter area shown as the higher | $5,100 | Printed (behind master meter, the higher) Effective 2026-04-21 Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, 04/21/2026 RATES - WATER CONNECTION fetched 2026-11-09, sha256 b11066b61ccc |
| Sewer connection (tap-on) fee, 4 inch (04/21/2026 rates) sewer | $2,850.00 (01/01/2027 rates $5,450.00) 4 inch | $2,850 | Printed Effective 2026-04-21 Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, 04/21/2026 RATES - SEWER CONNECTION fetched 2026-11-09, sha256 b11066b61ccc |
| Sewer inspection sewer | $30.00 per inspection | $30 | Printed Effective 2026-04-21 Source · Centerville Ordinance 2026-2 (water rates, sewer and tap-on fees), Chapter 22 Fees and other Charges, Water and Sewer Connection (tap-on) Fees, Misc. Sewer fetched 2026-11-09, sha256 b11066b61ccc |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.