Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Cartersville GA: water tap 1,100 and sewer tap 950 (3/4 inch, inside city), water capacity 1,180 and sewer capacity 1,470 (3/4 inch meter, inside city), all from the city Water & Sewer Rates page (FY26/27 ordinance of July 1 2026 changes only usage rates), and the residential building permit per Sec. 17-77: ICC table R-3 V-B 122.46 x 2,000 heated sq ft x .0035 = 857.22 (schedule effective Jan 4 2018, still the posted one). Cartersville posts no impact fee schedule. NOT included: trade permits ($25 issuing fee each plus per-item charges), meter set, outside-city rates (shown on each line), Bartow County school/other fees, stormwater. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap, 3/4 inch (inside city) water | $1,100.00 inside | $1,200.00 outside per tap | $1,100 | Printed (inside city) Effective n/a Source · City of Cartersville Water & Sewer Rates page, (c.) Tap Fees fetched 2026-11-09, sha256 18c0be5be7d6 |
| Sewer tap, 3/4 inch (inside city) sewer | $950.00 inside | $1,200.00 outside per tap | $950 | Printed (inside city) Effective n/a Source · City of Cartersville Water & Sewer Rates page, (c.) Tap Fees fetched 2026-11-09, sha256 18c0be5be7d6 |
| Water capacity fee, 3/4 inch meter (inside city) water | $1,180.00 inside | $970.00 outside per new tap | $1,180 | Printed (inside city) Effective n/a Source · City of Cartersville Water & Sewer Rates page, (d) Capacity Fees fetched 2026-11-09, sha256 18c0be5be7d6 |
| Sewer capacity fee, 3/4 inch meter (inside city) sewer | $1,470.00 inside | $1,080.00 outside per new tap | $1,470 | Printed (inside city) Effective n/a Source · City of Cartersville Water & Sewer Rates page, (d) Capacity Fees fetched 2026-11-09, sha256 18c0be5be7d6 |
| Residential building permit, new construction permit · computed | ICC rate (R-3, Type V-B, table dated Aug 2017) x heated sq ft x .0035 R-3 V-B rate 122.46 printed in the city table, 2,000 sq ft heated | $857.22 | 122.46 x 2,000 x 0.0035 = 857.22 Effective 2018-01-04 Source · Sec. 17-77 Building permits (b)(1) and ICC table, effective January 4 2018 fetched 2026-11-09, sha256 f4c6c6d3006c |
| Total listed | $5,557.22 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.