Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Bloomingdale GA: water tap-in for a 5/8-inch meter ($1,700, approved April 2023), sewer tap-in ($1,200 service line plus $3,600 gravity tap) and the single-family building permit ($0.35 per sq ft climate controlled, $0.25 per sq ft non-climate controlled, including saw pole, electrical, plumbing and mechanical inspections), from the fee schedule last amended February 8 2024. NOT included: the development impact fee schedule (ordinance article III, amended 2016 and noted as currently being updated, available at City Hall, amounts not posted), $50 extra inspections, Chatham County fees. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap-in fee, 5/8 inch meter (includes meter box and service line from tap to meter) water | $1,700.00 per 5/8 inch meter, meter rates approved April 6, 2023 | $1,700 | Printed Effective 2023-04-06 Source · City of Bloomingdale Fee Schedule (adopted April 21, 2005, last amended February 8, 2024), Tap-In Fees fetched 2026-11-09, sha256 0affecb9c393 |
| Sewer tap-in fee, 80 ft sewer service line from property line to sewer stub out sewer | $1,200.00 per sewer service line (additional line $8.50 per ft) | $1,200 | Printed Effective 2024-02-08 Source · City of Bloomingdale Fee Schedule (adopted April 21, 2005, last amended February 8, 2024), Tap-In Fees fetched 2026-11-09, sha256 0affecb9c393 |
| Sewer tap-in fee, 6 inch gravity sewer tap sewer | $3,600.00 per tap | $3,600 | Printed Effective 2024-02-08 Source · City of Bloomingdale Fee Schedule (adopted April 21, 2005, last amended February 8, 2024), Tap-In Fees fetched 2026-11-09, sha256 0affecb9c393 |
| Building permit, single family climate controlled (includes inspections) permit · computed | $0.35 per Sq. Ft. per sq ft climate controlled | $700 | $0.35 x 2,000 sq ft = 700.00 Effective 2024-02-08 Source · City of Bloomingdale Fee Schedule (adopted April 21, 2005, last amended February 8, 2024), Residential Construction fetched 2026-11-09, sha256 0affecb9c393 |
| Building permit, single family non-climate controlled (garage) permit · computed | $0.25 per Sq. Ft. per sq ft non-climate controlled | $100 | $0.25 x 400 sq ft = 100.00 Effective 2024-02-08 Source · City of Bloomingdale Fee Schedule (adopted April 21, 2005, last amended February 8, 2024), Residential Construction fetched 2026-11-09, sha256 0affecb9c393 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.