Ball Ground, GA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. Ball Ground GA: parks 2,000 and road 1,000 impact fees (single-family detached, program effective for permits from Oct 11 2024), sewer capacity charge 6,500 (3/4 inch per REU), water tap 750 + 3/4 inch meter 3,000, and building permit 2,800 (2,000 conditioned x 1.25 + 400 garage x 0.75), from the city fee schedules. The city building page says water capacity fees are due before a permit but no water capacity amount is printed in the stored schedule. NOT included: water capacity fee (not printed), plumbing/electrical/mechanical inspections (150 each), long side service bore 1,000, deposits, Cherokee County fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Parks and recreation impact fee, single-family detached
parks
$2,000 per dwelling (all administrative fees included)
per dwelling
$2,000Printed
Effective 2024-10-11
Source · Fee Schedule Attachment A Impact Fees, Single-Family Detached Housing
fetched 2026-11-09, sha256 1bd96d273ffc
Road improvements impact fee, single-family detached
transportation
$1,000 per dwelling
per dwelling
$1,000Printed
Effective 2024-10-11
Source · Fee Schedule Attachment A Impact Fees, Single-Family Detached Housing
fetched 2026-11-09, sha256 1bd96d273ffc
Sewer capacity charge, 3/4 inch meter per residential equivalent unit
sewer
$6,500.00
per REU, 3/4 inch meter
$6,500Printed
Effective 2025-01-09
Source · Ball Ground Community Development Fee Schedule (adopted Jan 9 2025), p.9 Sewer Fees
fetched 2026-11-09, sha256 cc8dd90ff452
Water line tapping, service and materials
water
$750.00
per tap
$750Printed
Effective 2025-01-09
Source · Ball Ground Community Development Fee Schedule (adopted Jan 9 2025), p.8 Water Service Installation Charges
fetched 2026-11-09, sha256 cc8dd90ff452
3/4 inch meter (Ball Ground furnishes meter, backflow and installation)
water
$3,000.00
3/4 inch meter
$3,000Printed
Effective 2025-01-09
Source · Ball Ground Community Development Fee Schedule (adopted Jan 9 2025), p.8 Water Service Installation Charges
fetched 2026-11-09, sha256 cc8dd90ff452
Building permit, new construction
permit · computed
(Conditioned space sq ft x $1.25) + (Non-conditioned space sq ft x $0.75); minimum $150
2,000 sq ft conditioned + 400 sq ft garage
$2,8002,000 x 1.25 + 400 x 0.75 = 2800.00
Effective 2025-01-09
Source · Ball Ground Community Development Fee Schedule (adopted Jan 9 2025), p.3 Building Permit Fees
fetched 2026-11-09, sha256 cc8dd90ff452

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199