St. Johns County Unincorporated Area, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Impact fees: 1,801-2,500 sq ft band (2,000 sq ft heated assumed), St. Johns County Master Impact Fee Schedule eff. March 4, 2026 (later phases step up each March 4). Water and sewer: St. Johns County Utility FY2027 tariff eff. Oct 1, 2026, 1.0 ERC. Building permit on computed valuation $380,268. Not included: reclaimed water connection $1,433.59 (only where reclaimed service is available), electrical/plumbing/mechanical/irrigation permits (priced per fixture/amp, depend on the plans), meter deposit/tap work, private-utility service areas (some St. Johns parcels are served by other utilities), school and fire special assessments. Parcels in areas served by another water/sewer provider differ. Staged 2026-11-09.
Water/sewer provider: St. Johns County Utility
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Roads impact fee impact | $12,015 per dwelling unit, 1,801-2,500 sq ft band | $12,015 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Schools impact fee impact | $6,082 per dwelling unit, 1,801-2,500 sq ft band | $6,082 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Public buildings impact fee impact | $968 per dwelling unit, 1,801-2,500 sq ft band | $968 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Fire rescue impact fee impact | $764 per dwelling unit, 1,801-2,500 sq ft band | $764 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Law and jail impact fee impact | $452 per dwelling unit, 1,801-2,500 sq ft band | $452 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Parks impact fee impact | $1,906 per dwelling unit, 1,801-2,500 sq ft band | $1,906 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Conservation and open space impact fee impact | $303 per dwelling unit, 1,801-2,500 sq ft band | $303 | Printed (2,000 sq ft heated assumed) Effective 2026-03-04 Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft fetched 2026-11-08, sha256 0b346ca26f0e |
| Water unit connection fee water | $3,026.47 per dwelling unit (1.0 ERC) | $3,026.47 | Printed Effective 2026-10-01 Source · System Rate Tariff FY2027 eff. Oct 1, 2026, Schedule A, Residences (a) single family, 1.0 ERC fetched 2026-11-08, sha256 54a756ba21d3 |
| Sewer unit connection fee sewer | $6,106.03 per dwelling unit (1.0 ERC) | $6,106.03 | Printed Effective 2026-10-01 Source · System Rate Tariff FY2027 eff. Oct 1, 2026, Schedule A, Residences (a) single family, 1.0 ERC fetched 2026-11-08, sha256 54a756ba21d3 |
| Building permit (valuation-based) permit · computed | $351.00 for the first $100,000 plus $2.26 for each additional thousand or fraction percent of valuation | $986.06 | Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft); 281 additional $1,000 units x 2.26 + 351.00 = 986.06 Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, $100,001 to $500,000 fetched 2026-11-08, sha256 fda77939d70d |
| Plan review permit · computed | One-half of the building permit fee percent of permit fee | $493.03 | 50% x 986.06 = 493.03 Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Plan Review Fees fetched 2026-11-08, sha256 fda77939d70d |
| Permit issuance fee permit | $20.00 flat | $20 | Printed Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Permit Issuance Fees fetched 2026-11-08, sha256 fda77939d70d |
| Residential lot grading permit permit | $132.00 flat | $132 | Printed Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Residential Lot Grading fetched 2026-11-08, sha256 fda77939d70d |
| Single family residential driveway permit permit | $46.00 flat per driveway | $46 | Printed Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Single Family Residential Driveway Permit fetched 2026-11-08, sha256 fda77939d70d |
| Clearing permit, single family lot (new construction) permit | $132.00 flat | $132 | Printed Effective 2026-05-01 Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Clearing and Tree Preservation fetched 2026-11-08, sha256 fda77939d70d |
| Total listed | $33,431.59 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.