Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$33,431.59listed total
19rank by 2025 new single-family permits

Not included: Impact fees: 1,801-2,500 sq ft band (2,000 sq ft heated assumed), St. Johns County Master Impact Fee Schedule eff. March 4, 2026 (later phases step up each March 4). Water and sewer: St. Johns County Utility FY2027 tariff eff. Oct 1, 2026, 1.0 ERC. Building permit on computed valuation $380,268. Not included: reclaimed water connection $1,433.59 (only where reclaimed service is available), electrical/plumbing/mechanical/irrigation permits (priced per fixture/amp, depend on the plans), meter deposit/tap work, private-utility service areas (some St. Johns parcels are served by other utilities), school and fire special assessments. Parcels in areas served by another water/sewer provider differ. Staged 2026-11-09.

Water/sewer provider: St. Johns County Utility

LinePrinted ratePrototypeReceipt
Roads impact fee
impact
$12,015
per dwelling unit, 1,801-2,500 sq ft band
$12,015Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Schools impact fee
impact
$6,082
per dwelling unit, 1,801-2,500 sq ft band
$6,082Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Public buildings impact fee
impact
$968
per dwelling unit, 1,801-2,500 sq ft band
$968Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Fire rescue impact fee
impact
$764
per dwelling unit, 1,801-2,500 sq ft band
$764Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Law and jail impact fee
impact
$452
per dwelling unit, 1,801-2,500 sq ft band
$452Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Parks impact fee
impact
$1,906
per dwelling unit, 1,801-2,500 sq ft band
$1,906Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Conservation and open space impact fee
impact
$303
per dwelling unit, 1,801-2,500 sq ft band
$303Printed (2,000 sq ft heated assumed)
Effective 2026-03-04
Source · Master Impact Fee Schedule, effective March 4, 2026 (Phase 1), Residential 1,801 to 2,500 sq ft
fetched 2026-11-08, sha256 0b346ca26f0e
Water unit connection fee
water
$3,026.47
per dwelling unit (1.0 ERC)
$3,026.47Printed
Effective 2026-10-01
Source · System Rate Tariff FY2027 eff. Oct 1, 2026, Schedule A, Residences (a) single family, 1.0 ERC
fetched 2026-11-08, sha256 54a756ba21d3
Sewer unit connection fee
sewer
$6,106.03
per dwelling unit (1.0 ERC)
$6,106.03Printed
Effective 2026-10-01
Source · System Rate Tariff FY2027 eff. Oct 1, 2026, Schedule A, Residences (a) single family, 1.0 ERC
fetched 2026-11-08, sha256 54a756ba21d3
Building permit (valuation-based)
permit · computed
$351.00 for the first $100,000 plus $2.26 for each additional thousand or fraction
percent of valuation
$986.06Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft); 281 additional $1,000 units x 2.26 + 351.00 = 986.06
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, $100,001 to $500,000
fetched 2026-11-08, sha256 fda77939d70d
Plan review
permit · computed
One-half of the building permit fee
percent of permit fee
$493.0350% x 986.06 = 493.03
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Plan Review Fees
fetched 2026-11-08, sha256 fda77939d70d
Permit issuance fee
permit
$20.00
flat
$20Printed
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Permit Issuance Fees
fetched 2026-11-08, sha256 fda77939d70d
Residential lot grading permit
permit
$132.00
flat
$132Printed
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Residential Lot Grading
fetched 2026-11-08, sha256 fda77939d70d
Single family residential driveway permit
permit
$46.00
flat per driveway
$46Printed
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Single Family Residential Driveway Permit
fetched 2026-11-08, sha256 fda77939d70d
Clearing permit, single family lot (new construction)
permit
$132.00
flat
$132Printed
Effective 2026-05-01
Source · Schedule of Fees and Services Exhibit A, Building Department, FY 27 Current, Clearing and Tree Preservation
fetched 2026-11-08, sha256 fda77939d70d
Total listed$33,431.59

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.