St. Augustine, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. St. Augustine FL: included = water tap and 3/4 inch meter 938.98, water flow-based fee 2,682.00 and sewer flow-based fee 2,001.30 (1 residential ERC, effective Jan 1 2016, still printed in the FY 2027 exhibit), sewer shallow-lateral tap 1,657.67, building permit 50 + 5 per additional thousand on the computed 380,268 (1,950) and plan review 975. MISSING: city Mobility Fee (Ordinance 2022-01, schedule inside the ordinance, benefit-district based, not read). NOT included: Northwest Area Forcemain Surcharge 1,226.40 per ERC (certain zones only), right-of-way restoration 719.78 per tap, mechanical/electrical/plumbing 50 each, St. Johns County educational facilities fee (city opts out of county impact fees). 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap and meter by utility, 3/4 inch water | $938.98 3/4 inch tap and meter installed by the utility | $938.98 | Printed Effective 2026-10-01 Source · St. Augustine Exhibit A FY 2027 Utility Rates and Fees, p.5 WATER Services - Tap and Meter - by Utility fetched 2026-11-09, sha256 fb658b0e1a51 |
| Water flow based fee, 1 residential ERC water | $2,682.00 per residential ERC ($8.94 per GPD) 1 residential ERC | $2,682 | Printed Effective 2016-01-01 Source · St. Augustine Exhibit A FY 2027 Utility Rates and Fees, p.6 Flow Based Fees, Water fetched 2026-11-09, sha256 fb658b0e1a51 |
| Sewer flow based fee, 1 residential ERC sewer | $2,001.30 per residential ERC ($9.53 per GPD) 1 residential ERC | $2,001.30 | Printed Effective 2016-01-01 Source · St. Augustine Exhibit A FY 2027 Utility Rates and Fees, p.6 Flow Based Fees, Sewer fetched 2026-11-09, sha256 fb658b0e1a51 |
| Sewer gravity tap, install shallow lateral (less than 5 ft deep), by utility sewer | $1,657.67 shallow lateral | $1,657.67 | Printed Effective 2026-10-01 Source · St. Augustine Exhibit A FY 2027 Utility Rates and Fees, p.5 SEWER Taps by Utility fetched 2026-11-09, sha256 fb658b0e1a51 |
| Building permit, new construction permit · computed | Minimum of $50 for the first $1,000 plus $5 for each additional thousand, or fraction thereof, of valuation valuation $380,268 (ICC BVD), 100% for new construction; additional = 379,268 -> 380 thousands | $1,950 | 50 + 5 x 380 = 1950.00 Effective n/a Source · St. Augustine Building permit fees - Table A, Permit fees fetched 2026-11-09, sha256 a3d47e1ea598 |
| Plan review fee permit · computed | 1/2 of the permit fee half of the building permit fee | $975 | 0.5 x 1950.00 = 975.00 Effective n/a Source · St. Augustine Building permit fees - Table A, Plan review fee fetched 2026-11-09, sha256 a3d47e1ea598 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.