Padstake
Menu

Santa Rosa County, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
34rank by 2025 new single-family permits

Impact fees verified. Not a full total. Only the transportation impact fee is verified: Santa Rosa County Impact Fee Information page, single-family detached $1,687 (collection began May 5, 2025; CPI +3.1% effective Jan 1, 2026). NOT included: school impact fee (a 2023 county study cites $5,000 per single-family unit adopted Jan 9, 2020; no current schedule fetched), fire impact fee (required in the Holley-Navarre, Midway, Avalon, Navarre Beach and Pace fire districts; amount not found), parks and law enforcement (only proposed in the 2023 study), water/sewer (utilities vary), building permit fees. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Transportation (road) impact fee
impact
$1,687
per single-family detached dwelling unit (includes a mobile home on a single-family lot)
$1,687Printed
Effective 2026-01-01
Source ยท Santa Rosa County Impact Fee Information page, Transportation Impact Fees (CPI adjusted +3.1% effective January 1, 2026), Single-family detached dwelling unit
fetched 2026-11-09, sha256 cdf40f483ada

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.