Port St. Lucie, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Port St. Lucie: city and St. Lucie County impact/mobility fees (sheet effective Nov 1 2026) plus Port St. Lucie Utility Systems treatment plant and line capacity charges (1 ERC), 5/8-inch meter installation and the water and wastewater permits from the FY2026-27 utility fee schedule (rev 10/01/26). NOT included: building permit fee (the city posts only ICC valuation and 11% plan review; rate table is in a fee calculator app), state surcharges, backflow assembly installation $408, guaranteed revenue monthly charge on reserved ERCs, septic-to-sewer assessments. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| City public buildings impact fee general | $615.00 per dwelling | $615 | Printed Effective 2026-11-01 Source · Single Family Residence column fetched 2026-11-07, sha256 e4eab23063fa |
| City police impact fee police | $347.00 per dwelling | $347 | Printed Effective 2026-11-01 Source · Single Family Residence column fetched 2026-11-07, sha256 e4eab23063fa |
| City parks impact fee parks | $2,356.00 per dwelling | $2,356 | Printed Effective 2026-11-01 Source · Single Family Residence column fetched 2026-11-07, sha256 e4eab23063fa |
| City mobility fee, single family (East of I-95, highest area) transportation · computed | $1.60 per sq ft (East of 95); SW $1.13, NW $1.42; max 3,500 sq ft per sq ft | $3,200 | Rule: highest area. 2,000 sq ft heated x $1.60 = $3,200.00 (sq ft basis assumed to be heated area) Effective 2026-11-01 Source · Mobility Fee table fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County public buildings impact fee general | $547.50 per dwelling (1-2 stories) | $547.50 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County law enforcement impact fee police | $369.00 per dwelling (1-2 stories) | $369 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County parks impact fee parks | $2,560.50 per dwelling (1-2 stories) | $2,560.50 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County library impact fee library | $395.89 per dwelling (1-2 stories) | $395.89 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County fire/EMS impact fee fire | $650.00 per dwelling (1-2 stories) | $650 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County school impact fee school | $6,786.00 per dwelling (1-2 stories) | $6,786 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| St. Lucie County multi-modal impact fee, detached single family 0-2,399 sf transportation | $2,317.00 per dwelling (1-2 stories) | $2,317 | Printed; collected by the City with the building permit Effective 2026-11-01 Source · County Impact Fees column, 1-2 Stories fetched 2026-11-07, sha256 e4eab23063fa |
| Water treatment plant capacity charge water | $4,925.00 per ERC | $4,925 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), Reservation/Connection Charges, City Code Sec. 61.11 fetched 2026-11-09, sha256 2b112c936dd1 |
| Wastewater treatment plant capacity charge sewer | $3,250.00 per ERC | $3,250 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), Reservation/Connection Charges, City Code Sec. 61.11 fetched 2026-11-09, sha256 2b112c936dd1 |
| Water line capacity charge water | $780.00 per ERC | $780 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), Reservation/Connection Charges, City Code Sec. 61.24 fetched 2026-11-09, sha256 2b112c936dd1 |
| Wastewater line capacity charge sewer | $1,972.00 per ERC | $1,972 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), Reservation/Connection Charges, City Code Sec. 61.24 fetched 2026-11-09, sha256 2b112c936dd1 |
| Meter installation fee, 5/8 x 3/4 inch water | $1,366.00 per meter | $1,366 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), Meter Installation Fee, City Code Sec. 61.05 fetched 2026-11-09, sha256 2b112c936dd1 |
| PSLUSD Water Permit permit | $450.00 per permit | $450 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), permits fetched 2026-11-09, sha256 2b112c936dd1 |
| PSLUSD Wastewater Permit permit | $450.00 per permit | $450 | Printed (1 ERC single-family assumed) Effective 2026-10-01 Source · Port St. Lucie Utility Systems Department Fee Schedule for Fiscal Year 2026-27 (rev 10/01/26), permits fetched 2026-11-09, sha256 2b112c936dd1 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.