Pinellas County Unincorporated Area, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Pinellas County FL (unincorporated, Pinellas County Utilities sewer): sewer connection fee for a single family residence $2,798.00, effective October 1, 2026 (the schedule page). NOT included: water capacity fee (by meter size, amounts not on the water fees page), multimodal impact fee (Chapter 150, schedule not found), fire/school and other impact fees, county building permit fees (only in the FY27 proposed budget pages), reclaimed water. Page never shows a total. 2026-11-09 second pass.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Sewer connection fee, a single family residence
sewer
$2,798.00
per single family residence
$2,798Printed
Effective 2026-10-01
Source ยท Pinellas County Utilities - Sewer System User Fees, Effective October 1, 2026, I. Sewer Connection Fee
fetched 2026-11-09, sha256 1cbb91a570fc

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.