Padstake
Menu

Osceola County Unincorporated Area, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
15rank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified: Osceola County residential rate sheet (effective June 20, 2025, posted for FY27), countywide single-family: mobility $21,710.14 + school $12,923.00 + park $2,304.72 + fire $780.00 = $37,717.86 (highest area; East of Lake Toho, South Lake Toho and Alligator Chain areas are lower). NOT included: water/sewer connection charges (utility serving the parcel not yet identified), $60 administrative fees (Appendix B not read), and building permit fees (posted on county Building Permit Fees page, src 296: 2,000-2,999 sq ft $560 + $40 plan review, 3% archival, radon $0.01/sq ft, not yet loaded). Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Mobility fee
impact
$21,710.14
per single-family dwelling unit, countywide (highest printed area; CMP areas are lower)
$21,710.14Printed
Effective 2025-06-20
Source · Impact and Mobility Fee Rates - Residential, effective June 20, 2025 (FY27 posting), Countywide, Single-Family
fetched 2026-11-08, sha256 142f4b233f27
School impact fee
impact
$12,923.00
per single-family dwelling unit, countywide (highest printed area; CMP areas are lower)
$12,923Printed
Effective 2025-06-20
Source · Impact and Mobility Fee Rates - Residential, effective June 20, 2025 (FY27 posting), Countywide, Single-Family
fetched 2026-11-08, sha256 142f4b233f27
Park impact fee
impact
$2,304.72
per single-family dwelling unit, countywide (highest printed area; CMP areas are lower)
$2,304.72Printed
Effective 2025-06-20
Source · Impact and Mobility Fee Rates - Residential, effective June 20, 2025 (FY27 posting), Countywide, Single-Family
fetched 2026-11-08, sha256 142f4b233f27
Fire impact fee
impact
$780.00
per single-family dwelling unit, countywide (highest printed area; CMP areas are lower)
$780Printed
Effective 2025-06-20
Source · Impact and Mobility Fee Rates - Residential, effective June 20, 2025 (FY27 posting), Countywide, Single-Family
fetched 2026-11-08, sha256 142f4b233f27

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.