Niceville, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Niceville FL (inside city): water impact 4,550 (meter up to 1 inch; Resolution 14-09-07, "in addition to meter cost plus installation"), sewer impact 2,830, stormwater impact 269.57, fire impact 200, construction water 305 (city Fee Schedule, Resolution 26-08-01 effective 9/1/2026), building permit 1,057 + 2.75 per $1,000 over 300,000 on the computed 380,268 (1,279.75), 25% residential plan review, residential inspection base fee 65 and CO 40. NOT included: water meter price (market rate, set by Public Works, not posted), state surcharges (1.5% BCAIF + 1% DBPR), trade permits, Okaloosa County and school fees, outside-city water impact (5,005, shown on the line). 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, meter up to 1 inch (inside city) water | $4,550 inside | $5,005 outside (in Resolution 14-09-07) single residence = one unit; 1 inch meter is the smallest size printed | $4,550 | Printed (inside city) Effective 2026-09-01 Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Water Impact Fee fetched 2026-11-09, sha256 37404e69acf0 |
| Sewer impact fee, residential unit sewer | $2,830 per dwelling unit per dwelling unit | $2,830 | Printed Effective 2026-09-01 Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Sewer Impact Fee fetched 2026-11-09, sha256 37404e69acf0 |
| Stormwater impact fee, residential stormwater | $269.57 per dwelling unit per dwelling unit | $269.57 | Printed Effective 2026-09-01 Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Stormwater Impact Fee fetched 2026-11-09, sha256 37404e69acf0 |
| Fire impact fee, single family detached residence fire | $200 (starts at $200, depending on use and size of structure) single family detached residence | $200 | Printed Effective 2026-09-01 Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Fire Impact Fee (Ordinance 06-04-02) fetched 2026-11-09, sha256 37404e69acf0 |
| Construction water water | $305 per dwelling unit per dwelling unit | $305 | Printed Effective 2026-09-01 Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Construction Water (Resolution 23-09-01) fetched 2026-11-09, sha256 37404e69acf0 |
| Building permit, $300,001 to $600,000 bracket permit · computed | $1,057 + $2.75 per $1,000 of valuation over $300,000 valuation $380,268 (ICC BVD); over 300,000 = 80.268, taken as 81 (each $1,000 or fraction) | $1,279.75 | 1,057 + 2.75 x 81 = 1279.75 Effective 2026-09-01 Source · Niceville Fees page, Building Permit Fees fetched 2026-11-09, sha256 37404e69acf0 |
| Residential plan review permit · computed | 25% of building permit fee 25% of permit fee | $319.94 | 0.25 x 1279.75 = 319.94 Effective 2026-09-01 Source · Niceville Fees page, Residential Plan Review fetched 2026-11-09, sha256 37404e69acf0 |
| Residential inspection base fee, new construction permit | $65 new construction permit inspection, up to 1 hour included | $65 | Printed Effective 2026-09-01 Source · Niceville Fees page, Inspection Fees fetched 2026-11-09, sha256 37404e69acf0 |
| CO/CC permit | $40 per certificate | $40 | Printed Effective 2026-09-01 Source · Niceville Fees page, General Permit Fees fetched 2026-11-09, sha256 37404e69acf0 |
| Total listed | $9,859.26 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.