Padstake
Menu

Niceville, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$9,859.26listed total
Nonerank by 2025 new single-family permits

Not included: Niceville FL (inside city): water impact 4,550 (meter up to 1 inch; Resolution 14-09-07, "in addition to meter cost plus installation"), sewer impact 2,830, stormwater impact 269.57, fire impact 200, construction water 305 (city Fee Schedule, Resolution 26-08-01 effective 9/1/2026), building permit 1,057 + 2.75 per $1,000 over 300,000 on the computed 380,268 (1,279.75), 25% residential plan review, residential inspection base fee 65 and CO 40. NOT included: water meter price (market rate, set by Public Works, not posted), state surcharges (1.5% BCAIF + 1% DBPR), trade permits, Okaloosa County and school fees, outside-city water impact (5,005, shown on the line). 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water impact fee, meter up to 1 inch (inside city)
water
$4,550 inside | $5,005 outside (in Resolution 14-09-07)
single residence = one unit; 1 inch meter is the smallest size printed
$4,550Printed (inside city)
Effective 2026-09-01
Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Water Impact Fee
fetched 2026-11-09, sha256 37404e69acf0
Sewer impact fee, residential unit
sewer
$2,830 per dwelling unit
per dwelling unit
$2,830Printed
Effective 2026-09-01
Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Sewer Impact Fee
fetched 2026-11-09, sha256 37404e69acf0
Stormwater impact fee, residential
stormwater
$269.57 per dwelling unit
per dwelling unit
$269.57Printed
Effective 2026-09-01
Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Stormwater Impact Fee
fetched 2026-11-09, sha256 37404e69acf0
Fire impact fee, single family detached residence
fire
$200 (starts at $200, depending on use and size of structure)
single family detached residence
$200Printed
Effective 2026-09-01
Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Fire Impact Fee (Ordinance 06-04-02)
fetched 2026-11-09, sha256 37404e69acf0
Construction water
water
$305 per dwelling unit
per dwelling unit
$305Printed
Effective 2026-09-01
Source · Niceville Community Development Fee Schedule (Resolution 26-08-01, effective 9/1/2026), Impact Fees for New Construction Inside the City Limits, Construction Water (Resolution 23-09-01)
fetched 2026-11-09, sha256 37404e69acf0
Building permit, $300,001 to $600,000 bracket
permit · computed
$1,057 + $2.75 per $1,000 of valuation over $300,000
valuation $380,268 (ICC BVD); over 300,000 = 80.268, taken as 81 (each $1,000 or fraction)
$1,279.751,057 + 2.75 x 81 = 1279.75
Effective 2026-09-01
Source · Niceville Fees page, Building Permit Fees
fetched 2026-11-09, sha256 37404e69acf0
Residential plan review
permit · computed
25% of building permit fee
25% of permit fee
$319.940.25 x 1279.75 = 319.94
Effective 2026-09-01
Source · Niceville Fees page, Residential Plan Review
fetched 2026-11-09, sha256 37404e69acf0
Residential inspection base fee, new construction
permit
$65
new construction permit inspection, up to 1 hour included
$65Printed
Effective 2026-09-01
Source · Niceville Fees page, Inspection Fees
fetched 2026-11-09, sha256 37404e69acf0
CO/CC
permit
$40
per certificate
$40Printed
Effective 2026-09-01
Source · Niceville Fees page, General Permit Fees
fetched 2026-11-09, sha256 37404e69acf0
Total listed$9,859.26

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.