Melbourne, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$10,271.25listed total
Nonerank by 2025 new single-family permits

Not included: Melbourne FL: water impact 2,755 and sewer impact 4,165, water connect 250 and sewer connect 100 (residential, city Utility Billing Rate Table page, undated), and the building permit 653 + 4.50 per $1,000 over $100,000 on the computed 380,268 valuation (1,917.50) with 50% plan check and the 125 administrative permit (Building Permit Fees effective Aug 7 2026). NOT included: 5% technology fee, 25 per additional reviewing department, 35 per trade review on multi-trade permits, deposits, meter cost, Brevard County and school impact fees. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water impact fee, residential (in Melbourne)
water
$2,755 in Melbourne | $2,755 outside
residential service
$2,755Printed
Effective n/a
Source · Melbourne FL Rate Table (Residential Water/Sewer), Water In Melbourne, Impact Fee
fetched 2026-11-09, sha256 986710c07e6c
Sewer impact fee, residential (in Melbourne)
sewer
$4,165 in Melbourne | $4,165 outside
residential service
$4,165Printed
Effective n/a
Source · Melbourne FL Rate Table (Residential Water/Sewer), Sewer In Melbourne, Impact Fee
fetched 2026-11-09, sha256 986710c07e6c
Water connect fee, residential
water
$250
residential service
$250Printed
Effective n/a
Source · Melbourne FL Rate Table (Residential Water/Sewer), Water In Melbourne, Connect Fee
fetched 2026-11-09, sha256 986710c07e6c
Sewer connect fee, residential
sewer
$100
residential service
$100Printed
Effective n/a
Source · Melbourne FL Rate Table (Residential Water/Sewer), Sewer In Melbourne, Connect Fee
fetched 2026-11-09, sha256 986710c07e6c
Building permit (construction-related permit fee schedule)
permit · computed
$653.00 for the first $100,000.00, plus $4.50 for each additional $1,000.00 or fraction thereof, up to and including $500,000.00
valuation $380,268 (ICC BVD convention); over 100,000 = 280.268 -> 281 thousands
$1,917.50653 + 4.50 x 281 = 1917.50
Effective n/a
Source · Melbourne Building Permit Fees effective August 7 2026, Construction-related permit fee schedule
fetched 2026-11-09, sha256 480bcefae80f
Plan check fee
permit · computed
50% of the base fee
50% of the base permit fee
$958.750.5 x 1917.50 = 958.75
Effective n/a
Source · Melbourne Building Permit Fees effective August 7 2026, Miscellaneous, Plan check fee
fetched 2026-11-09, sha256 480bcefae80f
Administrative permit
permit
$125.00
per permit
$125Printed
Effective n/a
Source · Melbourne Building Permit Fees effective August 7 2026, Miscellaneous, Administrative permit
fetched 2026-11-09, sha256 480bcefae80f
Total listed$10,271.25

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.