Padstake
Menu

Green Cove Springs, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Green Cove Springs FL: mobility fee single-family 1,500 to 2,499 sq ft 4,499 (rate schedule as of 10.01.2025; the city updates it each October 1 and the 2026 update was not posted), residential water capacity connection 2,372 and wastewater 2,531 (undated city page), new electric service 200, and new-residential building permit 6.00 per $1,000 on computed valuation $380,268 (undated Building Division fee sheet). NOT included: Clay County comprehensive impact fees and school impact fees (county host closed), water tap/meter, plumbing/mechanical/electrical permits, plan review. Page never shows a total. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Mobility fee, single family (1,500 to 2,499 sq ft)
transportation
$4,499
per dwelling (As of 10.01.2025; city updates each October 1)
$4,499Printed
Effective 2025-10-01
Source · City of Green Cove Springs Mobility Fee Rate Schedule, as of 10.01.2025, Land Use 210
fetched 2026-11-09, sha256 7ad53fd08d0c
Residential water capacity connection fee
water
$2,372
per dwelling unit
$2,372Printed
Effective n/a
Source · City of Green Cove Springs Impact Fees page, Capacity Connection Fees (undated page)
fetched 2026-11-09, sha256 c0aadc53cfa5
Residential wastewater capacity connection fee
sewer
$2,531
per dwelling unit
$2,531Printed
Effective n/a
Source · City of Green Cove Springs Impact Fees page, Capacity Connection Fees (undated page)
fetched 2026-11-09, sha256 c0aadc53cfa5
New electric service fee
electric
$200
charged at permit
$200Printed
Effective n/a
Source · City of Green Cove Springs Impact Fees page, Electric
fetched 2026-11-09, sha256 c0aadc53cfa5
Building permit, new residential building
permit · computed
$6.00 per $1,000.00 of estimated value or fraction thereof
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400), rounded up to 381 thousands
$2,2866.00 x 381 = 2,286.00
Effective n/a
Source · City of Green Cove Springs Building Division Related Fees (undated), New residential buildings
fetched 2026-11-09, sha256 5606f370ba5a

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.