Green Cove Springs, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Green Cove Springs FL: mobility fee single-family 1,500 to 2,499 sq ft 4,499 (rate schedule as of 10.01.2025; the city updates it each October 1 and the 2026 update was not posted), residential water capacity connection 2,372 and wastewater 2,531 (undated city page), new electric service 200, and new-residential building permit 6.00 per $1,000 on computed valuation $380,268 (undated Building Division fee sheet). NOT included: Clay County comprehensive impact fees and school impact fees (county host closed), water tap/meter, plumbing/mechanical/electrical permits, plan review. Page never shows a total. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Mobility fee, single family (1,500 to 2,499 sq ft) transportation | $4,499 per dwelling (As of 10.01.2025; city updates each October 1) | $4,499 | Printed Effective 2025-10-01 Source · City of Green Cove Springs Mobility Fee Rate Schedule, as of 10.01.2025, Land Use 210 fetched 2026-11-09, sha256 7ad53fd08d0c |
| Residential water capacity connection fee water | $2,372 per dwelling unit | $2,372 | Printed Effective n/a Source · City of Green Cove Springs Impact Fees page, Capacity Connection Fees (undated page) fetched 2026-11-09, sha256 c0aadc53cfa5 |
| Residential wastewater capacity connection fee sewer | $2,531 per dwelling unit | $2,531 | Printed Effective n/a Source · City of Green Cove Springs Impact Fees page, Capacity Connection Fees (undated page) fetched 2026-11-09, sha256 c0aadc53cfa5 |
| New electric service fee electric | $200 charged at permit | $200 | Printed Effective n/a Source · City of Green Cove Springs Impact Fees page, Electric fetched 2026-11-09, sha256 c0aadc53cfa5 |
| Building permit, new residential building permit · computed | $6.00 per $1,000.00 of estimated value or fraction thereof valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400), rounded up to 381 thousands | $2,286 | 6.00 x 381 = 2,286.00 Effective n/a Source · City of Green Cove Springs Building Division Related Fees (undated), New residential buildings fetched 2026-11-09, sha256 5606f370ba5a |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.