Gainesville, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Gainesville FL: GRU water connection charge $1,448 ($578 + $870) and wastewater connection charge $4,254 ($961 + $3,293) for a single-family home over 1,400 sq ft with a 3/4 inch meter, from the GRU FY2026 Adopted Utility Fees, Rates and Charges (effective Oct 1 2025; an FY2027 schedule was not found, so these may have changed on Oct 1 2026). NOT included: City of Gainesville building permit and impact fees (gainesville.org robots.txt returns 403, closed), meter installation charge (separate table), 25 percent surcharge outside city limits, Alachua County fees. Page never shows a total. 2026-11-09 lane B (gru.com is GRU's own official domain).
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection charge, single-family home over 1,400 sq ft heated and cooled, 3/4 inch or smaller meter water · computed | $578.00 transmission and distribution + $870.00 water treatment plant = $1,448.00 per connection | $1,448 | 578 + 870 = 1,448 Effective 2025-10-01 Source · GRU FY2026 Adopted Utility Fees, Rates and Charges (Exhibit A), Water connection charges (Sec. 27-129), p.17-18 fetched 2026-11-09, sha256 fe06d6fbb5fd |
| Wastewater connection charge, single-family home over 1,400 sq ft heated and cooled, 3/4 inch or smaller meter sewer · computed | $961.00 collection + $3,293.00 treatment plant = $4,254.00 per connection | $4,254 | 961 + 3,293 = 4,254 Effective 2025-10-01 Source · GRU FY2026 Adopted Utility Fees, Rates and Charges (Exhibit A), Wastewater connection charges (Sec. 27-171), p.21 fetched 2026-11-09, sha256 fe06d6fbb5fd |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.