Daytona Beach, FL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Verified from city documents: impact fees effective Dec 1, 2025 to Nov 30, 2026 (single family 2,000-2,999 sq ft: fire/EMS $444.67, general government $720, parks $1,829, police $482.33, roads $380 = $3,856 printed) plus water and wastewater tap fees (3/4-inch water $2,252, wastewater $2,209) and capital facilities fees (water $2,184, sewer $3,501) from the Oct 1, 2025 water/sewer fee sheet. NOT included: building permit fees (2025-26 fee schedule src 528 downloaded but its text is scrambled and not loaded), Volusia County impact fees (county statement required with the permit; not read), meter and sewer deposits ($118 each, refundable). Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Fire/EMS impact fee
impact
444.67
per single-family dwelling unit, 2,000 - 2,999 sq ft
$444.67Printed
Effective 2025-12-01
Source · City of Daytona Beach Impact Fees, December 1, 2025 to November 30, 2026, Residential-Single Family 2,000 - 2,999.99 sq ft
fetched 2026-11-09, sha256 e4a4c9963c85
General government impact fee
impact
720.00
per single-family dwelling unit, 2,000 - 2,999 sq ft
$720Printed
Effective 2025-12-01
Source · City of Daytona Beach Impact Fees, December 1, 2025 to November 30, 2026, Residential-Single Family 2,000 - 2,999.99 sq ft
fetched 2026-11-09, sha256 e4a4c9963c85
Parks impact fee
impact
1,829.00
per single-family dwelling unit, 2,000 - 2,999 sq ft
$1,829Printed
Effective 2025-12-01
Source · City of Daytona Beach Impact Fees, December 1, 2025 to November 30, 2026, Residential-Single Family 2,000 - 2,999.99 sq ft
fetched 2026-11-09, sha256 e4a4c9963c85
Police impact fee
impact
482.33
per single-family dwelling unit, 2,000 - 2,999 sq ft
$482.33Printed
Effective 2025-12-01
Source · City of Daytona Beach Impact Fees, December 1, 2025 to November 30, 2026, Residential-Single Family 2,000 - 2,999.99 sq ft
fetched 2026-11-09, sha256 e4a4c9963c85
Roads impact fee
impact
380.00
per single-family dwelling unit, 2,000 - 2,999 sq ft
$380Printed
Effective 2025-12-01
Source · City of Daytona Beach Impact Fees, December 1, 2025 to November 30, 2026, Residential-Single Family 2,000 - 2,999.99 sq ft
fetched 2026-11-09, sha256 e4a4c9963c85
Water tap fee, standard installation, 3/4 inch
water
$2,252.00
per 3/4 inch meter
$2,252Printed
Effective 2025-10-01
Source · City of Daytona Beach Water/Sewer Fees, updated/effective October 1, 2025 (capital facilities fees updated Dec 1, 2025), Water Fees
fetched 2026-11-09, sha256 304d972696e0
Water connection capital facilities fee, single family
water
$2,184.00
per single family residence
$2,184Printed
Effective 2025-12-01
Source · City of Daytona Beach Water/Sewer Fees, updated/effective October 1, 2025 (capital facilities fees updated Dec 1, 2025)
fetched 2026-11-09, sha256 304d972696e0
Wastewater tap fee, standard installation
sewer
$2,209.00
per connection
$2,209Printed
Effective 2025-10-01
Source · City of Daytona Beach Water/Sewer Fees, updated/effective October 1, 2025 (capital facilities fees updated Dec 1, 2025), Sewer Fees
fetched 2026-11-09, sha256 304d972696e0
Wastewater connection sewer capital facilities fee, single family
sewer
$3,501.00
per single family residence
$3,501Printed
Effective 2025-12-01
Source · City of Daytona Beach Water/Sewer Fees, updated/effective October 1, 2025 (capital facilities fees updated Dec 1, 2025)
fetched 2026-11-09, sha256 304d972696e0

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.