Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$11,658listed total
Nonerank by 2025 new single-family permits

Not included: Crestview FL: water impact 2,251 and sewer impact 5,146 per ERU (Ordinance 2035), 3/4 inch water connection 1,214 and residential 4 inch sewer connection 2,090 (inside city), master permit fee on computed valuation $380,268 (365 + 2.00 x 281 = 927), $30 tap permit, from the City of Crestview Comprehensive Fee Schedule amended Sept 14 2026 (effective Oct 1 2026). Crestview has no parks/roads impact fee in the schedule. NOT included: electrical/mechanical/plumbing/gas trade permits, building sewer permit and inspection $150, backflow device $45, plan review $250 line (private-provider text only), Okaloosa County and school impact fees, deposits, out-of-city 150% rates. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water impact fee
water
$2,251 per ERU
per equivalent residential unit (Ordinance 2035)
$2,251Printed, 1 ERU
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.15 Impact Fees
fetched 2026-11-09, sha256 c68d769422da
Sanitary sewer impact fee
sewer
$5,146 per ERU
per equivalent residential unit (Ordinance 2035)
$5,146Printed, 1 ERU
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.15 Impact Fees
fetched 2026-11-09, sha256 c68d769422da
Water connection, 3/4 inch residential
water
$1,214.00
inside city; out-of-city 150%
$1,214Printed (inside city)
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.14 Water and Sewer Connection Fees
fetched 2026-11-09, sha256 c68d769422da
Sewer connection, residential 4 inch
sewer
$2,090.00
inside city; out-of-city 150%
$2,090Printed (inside city)
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.14 Water and Sewer Connection Fees
fetched 2026-11-09, sha256 c68d769422da
Master permit fee (building permit)
permit · computed
$365.00 for the first $100,000 plus $2.00 per additional $1,000 or fraction, to $500,000
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400)
$927365 + 2.00 x 281 (280.268 rounded up) = 927.00
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.8 Master Permit Fees
fetched 2026-11-09, sha256 c68d769422da
Residential water and sewer tap permit
permit
$30.00
per residential sewer/water tap and line roughed in
$30Printed
Effective 2026-10-01
Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), Water and Sewer Permit Fees
fetched 2026-11-09, sha256 c68d769422da
Total listed$11,658

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.