Crestview, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Crestview FL: water impact 2,251 and sewer impact 5,146 per ERU (Ordinance 2035), 3/4 inch water connection 1,214 and residential 4 inch sewer connection 2,090 (inside city), master permit fee on computed valuation $380,268 (365 + 2.00 x 281 = 927), $30 tap permit, from the City of Crestview Comprehensive Fee Schedule amended Sept 14 2026 (effective Oct 1 2026). Crestview has no parks/roads impact fee in the schedule. NOT included: electrical/mechanical/plumbing/gas trade permits, building sewer permit and inspection $150, backflow device $45, plan review $250 line (private-provider text only), Okaloosa County and school impact fees, deposits, out-of-city 150% rates. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee water | $2,251 per ERU per equivalent residential unit (Ordinance 2035) | $2,251 | Printed, 1 ERU Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.15 Impact Fees fetched 2026-11-09, sha256 c68d769422da |
| Sanitary sewer impact fee sewer | $5,146 per ERU per equivalent residential unit (Ordinance 2035) | $5,146 | Printed, 1 ERU Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.15 Impact Fees fetched 2026-11-09, sha256 c68d769422da |
| Water connection, 3/4 inch residential water | $1,214.00 inside city; out-of-city 150% | $1,214 | Printed (inside city) Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.14 Water and Sewer Connection Fees fetched 2026-11-09, sha256 c68d769422da |
| Sewer connection, residential 4 inch sewer | $2,090.00 inside city; out-of-city 150% | $2,090 | Printed (inside city) Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.14 Water and Sewer Connection Fees fetched 2026-11-09, sha256 c68d769422da |
| Master permit fee (building permit) permit · computed | $365.00 for the first $100,000 plus $2.00 per additional $1,000 or fraction, to $500,000 valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400) | $927 | 365 + 2.00 x 281 (280.268 rounded up) = 927.00 Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), p.8 Master Permit Fees fetched 2026-11-09, sha256 c68d769422da |
| Residential water and sewer tap permit permit | $30.00 per residential sewer/water tap and line roughed in | $30 | Printed Effective 2026-10-01 Source · City of Crestview Comprehensive Fee Schedule, Amended September 14, 2026 (effective October 1, 2026), Water and Sewer Permit Fees fetched 2026-11-09, sha256 c68d769422da |
| Total listed | $11,658 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.