Coral Gables, FL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. Coral Gables FL: included = city impact fees for a 1,401-2,500 sq ft residence (police 215, fire 242, municipal 735, parks and recreation 5,774, mobility 1,304, administrative charge 70), sanitary sewer capacity fee 850 + 10 service charge (0.75 inch meter), and the residential building permit 2.00% to 250,000 + 2.25% above on the computed 380,268 (7,931.03), from the Fee Schedule published Sept 15 2026. MISSING: water connection/capacity (water service is Miami-Dade Water and Sewer, a separate utility, no amount posted by the city). NOT included: electrical (2.00% schedule), plumbing, mechanical permits, Miami-Dade County impact fees and surcharges, school fees. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Police impact fee, residential 1,401 to 2,500 sq ft police | $215 2,000 sq ft heated falls in the 1,401-2,500 band | $215 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Fire impact fee, residential 1,401 to 2,500 sq ft fire | $242 2,000 sq ft heated falls in the 1,401-2,500 band | $242 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Municipal impact fee, residential 1,401 to 2,500 sq ft general | $735 2,000 sq ft heated falls in the 1,401-2,500 band | $735 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Parks and Recreation impact fee, residential 1,401 to 2,500 sq ft parks | $5,774 2,000 sq ft heated falls in the 1,401-2,500 band | $5,774 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Mobility impact fee, residential 1,401 to 2,500 sq ft transportation | $1,304 2,000 sq ft heated falls in the 1,401-2,500 band | $1,304 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Impact fee administrative charge, residential 1,401 to 2,500 sq ft general | $70 2,000 sq ft heated falls in the 1,401-2,500 band | $70 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Impact Fee Schedule, City Code Sec. 2-2109(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Sanitary sewer capacity fee, 0.75 inch meter sewer | $850.00 (service charge $10.00) 0.75 inch meter | $850 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Sewer Capacity and Service Charge Fee Schedule, Sec. 78-135(a) fetched 2026-11-09, sha256 2c23527ecfb7 |
| Sanitary sewer service charge, 0.75 inch meter sewer | $10.00 0.75 inch meter | $10 | Printed Effective 2017-06-29 Source · Coral Gables Fee Schedule published September 15 2026, Sewer Capacity and Service Charge Fee Schedule fetched 2026-11-09, sha256 2c23527ecfb7 |
| Residential building permit (Florida Building Code, Residential) permit · computed | 2.00% up to and including $250,000 construction value; 2.25% of the amount exceeding $250,000; $200 minimum valuation $380,268 (ICC BVD convention) | $7,931.03 | 0.02 x 250,000 + 0.0225 x 130,268 = 7931.03 Effective 2020-11-01 Source · Coral Gables Fee Schedule published September 15 2026, Building Permit Fee Schedule, Sec. 105-85 fetched 2026-11-09, sha256 2c23527ecfb7 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.