Padstake
Menu

Milford, DE

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Included: city water and sewer impact fees (steps effective July 1 2026, read visually from the rendered fee schedule dated 2/27/25), meter, meter installation, tap permits and inspections, new dwelling permit on heated and unheated area, certificate of occupancy. Not included: Kent County sewer impact fee ("as determined by Kent County, per EDU", amount not posted), sewer and water tap/connection at actual city cost, area-specific aid-in-construction pump station fees ($2,022 Route 30, $939 Shawnee Acres, $4,321 Windward on the River), Carlisle Enhancement Fund (1/4 of 1%) and Police and General Government Facilities Enhancement Fund (3/4 of 1%) of heated square foot cost (cost basis not defined), trade permits. Square footage assumed 2,000 heated, 400 garage. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Milford

LinePrinted ratePrototypeReceipt
Water impact fee, city (per EDU), effective July 1, 2026
water
$3,887 per EDU
per EDU
$3,887Printed step effective July 1 2026 (July 1 2025: $3,738); 1 EDU
Effective 2026-07-01
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 23 Water Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Sewer impact fee, city (per EDU), effective July 1, 2026
sewer
$2,054 per EDU
per EDU
$2,054Printed step effective July 1 2026 (July 1 2025: $1,975); 1 EDU
Effective 2026-07-01
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 14 Sewer Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Water meter, residential 1-inch
water
$200.00
per meter
$200Printed
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 23 Water Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Water meter installation
water
$35.00
per meter
$35Printed
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 23 Water Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Water tap/connection permit
water
$10.00
per permit
$10Printed (tap/connection itself at actual city cost, not posted)
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 23 Water Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Water line inspection
water
$35.00
per inspection
$35Printed
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 23 Water Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Sewer utility permit
sewer
$10.00
per permit
$10Printed (tap/connection at actual city cost, not posted)
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 14 Sewer Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Sewer inspection
sewer
$35 per inspection
per inspection
$35Printed
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 14 Sewer Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
New dwelling unit building permit
permit · computed
$50 per 100 heated square feet plus $13 per 100 unheated square feet
per 100 sq ft
$1,05250 x (2,000 heated / 100) + 13 x (400 garage / 100) = 1,052.00
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 1 Building Inspection And Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228
Certificate of occupancy
permit
$25.00
flat
$25Printed
Effective n/a
Source · City of Milford DE Fee Schedule (2/27/25) rendered pages, page 1 Building Inspection And Permitting Fees
fetched 2026-11-09, sha256 c8c5fa833228

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.