Milpitas, CA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified only, utility connection fees. Included: Milpitas sewer connection fee, treatment plant fee and water connection fee for a single family residence from the Engineering Department fee schedule. Missing: storm drainage impact fee (priced per 100 sq ft of runoff surface: $0 Metro area, $119 Gateway-Main Street, $587 remaining urban area; runoff area depends on the plan), construction traffic impact fee ($400 per vehicle trip, construction traffic only), park fees (Planning Division, no amount posted), water meter charges, building permit fees (separate Building Fee Schedule not read), school fees. Searched 2026-11-09.
Water/sewer provider: City of Milpitas (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer connection fee, residential single family residence (Single Family/Duplex) sewer | $1,908 per single family residence | $1,908 | Printed Effective 2026-02-16 Source · City of Milpitas Engineering Department Fees and Deposits (Rev 13 dated 11/06/2026, effective 02/16/2026), Sewer fees fetched 2026-11-09, sha256 f557774ac6bd |
| Treatment plant fee, residential single family or duplex (paid before final inspection) sewer | $880 per dwelling unit | $880 | Printed Effective 2026-02-16 Source · City of Milpitas Engineering Department Fees and Deposits (Rev 13 dated 11/06/2026, effective 02/16/2026), Treatment Plant Fee fetched 2026-11-09, sha256 f557774ac6bd |
| Water connection fee, residential single family residence (Single Family/Duplex) water | $1,910 per single family residence | $1,910 | Printed Effective 2026-02-16 Source · City of Milpitas Engineering Department Fees and Deposits (Rev 13 dated 11/06/2026, effective 02/16/2026), Water Fees fetched 2026-11-09, sha256 f557774ac6bd |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.