Huntington Beach, CA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified only, city sewer and water connection charges. Included: Huntington Beach city sewer connection fee (single family) and residential water capital facility charge for a 3/4-inch meter, FY 2026/27 master fee schedule. Missing: Orange County Sanitation District capital facilities capacity charge (the table image is not in the stored PDF), traffic impact fee and other development impact fees ("see notes", amounts not printed), building permit fees (separate permit schedule not read), school and library fees. Searched 2026-11-09.
Water/sewer provider: City of Huntington Beach (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| City sewer connection fee, single family dwelling unit sewer | $2,620 per dwelling unit | $2,620 | Printed Effective 2026-07-01 Source · City of Huntington Beach Master Fee & Charges Schedule effective July 1, 2026, Sewer & Water Fee Schedule p.21, City Sewer Connection Fees fetched 2026-11-09, sha256 f60cf8f41e57 |
| Water capital facility charge, residential development, 3/4-inch meter (1 EDU) water | $2,862 per 3/4" meter | $2,862 | Printed Effective 2026-07-01 Source · City of Huntington Beach Master Fee & Charges Schedule effective July 1, 2026, Sewer & Water Fee Schedule p.21, Water Capital Facility Charge fetched 2026-11-09, sha256 f60cf8f41e57 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.