Padstake
Menu

Escondido, CA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$61,938.71listed total
Nonerank by 2025 new single-family permits

Not included: Included: valuation permit (city multipliers, $425,088), plan check, state surcharges, MEP inspection fees, planning and fire review, processing and fire inspection fees, water connection (1-inch), SDCWA capacity charge, wastewater connection, regional and local traffic, public facility, park, drainage and other flat fees from the July 21, 2026 Fee Guide and its detached single-family example. Not included: region of influence infrastructure deposit $1,500 (only in that region), SMIP, green building and other valuation-based small fees (general plan update, building technology, art in public places), water meter purchase, disabled access surcharge 10%, school fees (district), business enhancement zone or other fee reductions, third party review. Fees in effect at permit issuance apply. Searched 2026-11-09.

Water/sewer provider: City of Escondido (water, wastewater); San Diego County Water Authority (capacity charge)

LinePrinted ratePrototypeReceipt
Building permit fee (valuation-based, Table 3-A)
permit · computed
$1,760.00 for the first $100,000.00 plus $11.44 for each additional $1,000.00 or fraction thereof
percent of valuation
$5,489.44City valuation $425,088 (city multipliers: 2,000 sq ft x ($189.08 + $5.34 + $7.19) + 400 sq ft garage x ($49.33 + $5.34)); 326 additional $1,000 units x 11.44 + 1,760.00 = 5,489.44. Uses the city own multipliers, not the Padstake $380,268
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Table 3-A
fetched 2026-11-09, sha256 c7dbc87ac91c
Plan check fee
permit · computed
75% of Building Permit Fee
percent of permit fee
$4,117.0875% x 5,489.44 = 4,117.08
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Processing Fees
fetched 2026-11-09, sha256 c7dbc87ac91c
State energy regulation plan check surcharge
permit · computed
20% of Plan Check Fee
percent of plan check fee
$823.4220% x 4,117.08 = 823.42
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Plan check surcharges
fetched 2026-11-09, sha256 c7dbc87ac91c
State energy regulation inspection surcharge
permit · computed
20% of Building Permit Fee
percent of permit fee
$1,097.8920% x 5,489.44 = 1,097.89
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Building permit surcharges
fetched 2026-11-09, sha256 c7dbc87ac91c
Mechanical, electrical and plumbing inspection fees
permit · computed
.10% of Building Permit Fee (per each category)
10% of permit fee x 3 trades
$1,646.833 x 10% x 5,489.44 = 1,646.83
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Building permit surcharges
fetched 2026-11-09, sha256 c7dbc87ac91c
Planning Division building plan review fee, single family dwelling
permit
$1,880 (RES)
flat
$1,880Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Processing Fees
fetched 2026-11-09, sha256 c7dbc87ac91c
Fire Department building plan review fee, 2,001-5,000 sq ft
permit
$349
flat, by building area
$349Printed (2,000 sq ft heated + 400 garage = 2,400)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Fire Department - Building Plan Review Fee
fetched 2026-11-09, sha256 c7dbc87ac91c
Building permit processing fee
permit
$73.00
flat
$73Printed (Example #1 single-family dwelling)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Fire Department inspection fee
permit
$388.00
flat
$388Printed (Example #1 single-family dwelling)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Water connection fee, detached single-family (minimum 1-inch meter for fire sprinklers)
water
$7,930.00
per dwelling
$7,930Printed (Example #1)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
SDCWA capacity charge, 1-inch water meter
water
$10,182.00
per meter, paid at meter purchase
$10,182Printed (Example #1)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Wastewater connection fee
sewer
$7,500.00
per EDU (250 GPD)
$7,500Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Traffic fee regional (RTCIP), single-family dwelling
transportation
$3,109.88
per dwelling
$3,109.88Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Traffic Fee Regional
fetched 2026-11-09, sha256 c7dbc87ac91c
Traffic fee local, single-family dwelling
transportation
$4,191.77
per dwelling
$4,191.77Printed (Example #1)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Public facility fee, single-family dwelling
general
$4,969.99
per dwelling
$4,969.99Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Park fee, single-family dwelling
parks
$6,986.29
per unit
$6,986.29Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Park Fee
fetched 2026-11-09, sha256 c7dbc87ac91c
Drainage facilities fee, single-family dwelling
stormwater
$1,136.12
per unit
$1,136.12Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Drainage Facilities Fee
fetched 2026-11-09, sha256 c7dbc87ac91c
Citywide facilities plan reimbursement fee
general
$58.00
per dwelling
$58Printed
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
CATV fee
general
$10.00
flat
$10Printed (Example #1)
Effective 2026-07-21
Source · City of Escondido Fee Guide for Development Projects, updated July 21, 2026, Example #1
fetched 2026-11-09, sha256 c7dbc87ac91c
Total listed$61,938.71

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.