Padstake
Menu

Dublin, CA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$149,798.25listed total
Nonerank by 2025 new single-family permits

Not included: Included: Dublin public facilities impact fee at $20.37 per sq ft on 2,000 sq ft, fire facilities fee, Eastern Dublin transportation fee at the highest area (with BART garage), Tri-Valley fee, and DSRSD plus Zone 7 water capacity fees and meter assembly for the smallest standard meter (5/8-inch with a 10 gpm restriction; a plain 5/8-inch iPerl 25 gpm meter totals $129,259).Included also: DSRSD wastewater capacity reserve fees (regional $15,283 + local $2,725 = $18,008 per single-family unit). Included also: building permit by valuation (FY 2026-27 master fee schedule). Missing: separate plan check or review charges (not read), city valuation factors, Eastern Dublin noise mitigation ($4.74), freeway interchange ($417.33 from 9/1/2026), affordable housing in-lieu ($16.88 per sq ft for certain developments), school fees, storm drain benefit districts. Searched 2026-11-09.

Water/sewer provider: City of Dublin; Dublin San Ramon Services District (water, wastewater); Zone 7 Water Agency

LinePrinted ratePrototypeReceipt
Public Facilities Impact Fee, residential dwelling unit (civic center, library, parks, community recreation, aquatic)
parks · computed
$20.37 per sq. ft.
per sq ft of dwelling
$40,740$20.37 x 2,000 sq ft heated = 40,740.00 (garage not counted)
Effective 2026-07-01
Source · City of Dublin Finance Dept IMPACT FEES FY 2026-27 (effective July 1, 2026), Public Facilities
fetched 2026-11-09, sha256 c07f53c1d309
Fire facilities impact fee, single-family
fire
$339
per unit
$339Printed
Effective 2026-07-01
Source · City of Dublin Finance Dept IMPACT FEES FY 2026-27 (effective July 1, 2026), Fire
fetched 2026-11-09, sha256 c07f53c1d309
Eastern Dublin transportation impact fee, low density, outside transit center (EDTIF $17,172 + BART garage $887)
transportation
$18,059
per unit
$18,059Printed; highest printed area; Western Dublin TIF $8,362, Dublin Crossing $9,476
Effective 2026-07-01
Source · City of Dublin Finance Dept IMPACT FEES FY 2026-27 (effective July 1, 2026), EDTIF
fetched 2026-11-09, sha256 c07f53c1d309
Tri-Valley Transportation Development Fee, single family
transportation
$7,239.25
per unit
$7,239.25Printed
Effective 2026-07-01
Source · City of Dublin Finance Dept IMPACT FEES FY 2026-27 (effective July 1, 2026), TVTD
fetched 2026-11-09, sha256 c07f53c1d309
DSRSD water capacity reserve fee, 5/8-inch meter (10 gpm restriction)
water
$15,722.00
per meter
$15,722Printed
Effective 2026-07-01
Source · DSRSD Water Capacity Reserve Fees for Dublin, as of July 1, 2026, 5/8-inch iPerl with 10 gpm restriction
fetched 2026-11-09, sha256 ca9b85e70f44
Zone 7 water connection fee, 5/8-inch meter (10 gpm restriction)
water
$35,670.00
per meter
$35,670Printed
Effective 2026-07-01
Source · DSRSD Water Capacity Reserve Fees for Dublin, as of July 1, 2026, 5/8-inch iPerl with 10 gpm restriction
fetched 2026-11-09, sha256 ca9b85e70f44
Meter assembly fee, 5/8-inch meter
water
779.00
per meter
$779Printed
Effective 2026-07-01
Source · DSRSD Water Capacity Reserve Fees for Dublin, as of July 1, 2026, 5/8-inch iPerl with 10 gpm restriction
fetched 2026-11-09, sha256 ca9b85e70f44
DSRSD wastewater capacity reserve fee, regional, single family residence
sewer
$15,283.00
per unit
$15,283Printed
Effective 2026-07-01
Source · DSRSD Water Capacity Reserve Fees for Dublin, as of July 1, 2026, 5/8-inch iPerl with 10 gpm restriction
fetched 2026-11-09, sha256 ca9b85e70f44
DSRSD wastewater capacity reserve fee, local, single family residence
sewer
$2,725.00
per unit
$2,725Printed
Effective 2026-07-01
Source · DSRSD Water Capacity Reserve Fees for Dublin, as of July 1, 2026, 5/8-inch iPerl with 10 gpm restriction
fetched 2026-11-09, sha256 ca9b85e70f44
Building permit (valuation-based, fee effective 7/1/26)
permit · computed
$5,093.00 for the first $100,000 plus $29.00 for each additional $1000 or fraction thereof ($100,001-$500,000)
percent of valuation
$13,242Valuation $380,268 (Padstake standard: ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400; the schedule says valuation is calculated using city valuation factors that were not read); 281 additional $1,000 units x 29 + 5,093 = 13,242.00
Effective 2026-07-01
Source · City of Dublin Master Fee Schedule FY 2026-27, Section 7.1 Building Permits (Total Valuation)
fetched 2026-11-09, sha256 a6d510c60aab
Total listed$149,798.25

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.