Chino Hills, CA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified, with water and sewer fees. Included: Chino Hills existing infrastructure, fire, general city, housing in-lieu, parks (non-subdivision, highest printed), sewer, storm drain, traffic, water facilities fees, IEUA regional connection fee and 3/4-inch meter cost, July 1 2026 schedule (page images read visually; transcription appended to the stored text). Missing: Quimby in-lieu ($3,880, subdivisions only), Special Tax A ($6,259.85) and B ($702.68) (nature not explained on the schedule), water meter deposit, building permit and plan check fees (separate Master Schedule of Fees not read), school fees. Searched 2026-11-09.

Water/sewer provider: City of Chino Hills (water, sewer)

LinePrinted ratePrototypeReceipt
Existing infrastructure fee, single-family
impact
$11,450.00
per dwelling unit
$11,450Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1
fetched 2026-11-09, sha256 5273331117de
Fire facilities fee, single-family, $0.77 per sq ft x 2,000 sq ft
fire · computed
$0.77
per sq ft
$1,5400.77 x 2,000 = $1,540
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1
fetched 2026-11-09, sha256 5273331117de
General city facilities fee, single-family, $0.95 per sq ft x 2,000 sq ft
general · computed
$0.95
per sq ft
$1,9000.95 x 2,000 = $1,900
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1
fetched 2026-11-09, sha256 5273331117de
Housing in-lieu fee, single-family, $1 per sq ft x 2,000 sq ft (not to exceed $3,500 per unit)
housing · computed
$1/sq.ft.
per sq ft
$2,0001 x 2,000 = $2,000 (below the $3,500 cap)
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1
fetched 2026-11-09, sha256 5273331117de
Parks and recreation facilities fee, single-family non-subdivision, $0.99 per sq ft x 2,000 sq ft (subdivision $0.83 per sq ft)
parks · computed
$0.99
per sq ft
$1,980Highest printed (non-subdivision); 0.99 x 2,000 = $1,980; subdivision rate $0.83 gives $1,660
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1
fetched 2026-11-09, sha256 5273331117de
Sewer facilities fee, single-family
sewer
$644.16
per dwelling unit
$644.16Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2
fetched 2026-11-09, sha256 5273331117de
Storm drain facilities fee, single-family
stormwater
$1,758.18
per dwelling unit
$1,758.18Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2
fetched 2026-11-09, sha256 5273331117de
Traffic facilities impact fee, single-family, $0.79 per sq ft x 2,000 sq ft
transport · computed
$0.79
per sq ft
$1,5800.79 x 2,000 = $1,580
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2
fetched 2026-11-09, sha256 5273331117de
Water facilities fee, single-family
water
$8,944.29
per dwelling unit
$8,944.29Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2
fetched 2026-11-09, sha256 5273331117de
Inland Empire Utilities Agency (IEUA) regional connection fee, residential
sewer
$8,620.00
per dwelling unit
$8,620Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.3
fetched 2026-11-09, sha256 5273331117de
Water meter cost, 3/4-inch meter
tap
$397.00
per 3/4" meter
$397Printed
Effective 2026-07-01
Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.3
fetched 2026-11-09, sha256 5273331117de

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.