Chino Hills, CA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified, with water and sewer fees. Included: Chino Hills existing infrastructure, fire, general city, housing in-lieu, parks (non-subdivision, highest printed), sewer, storm drain, traffic, water facilities fees, IEUA regional connection fee and 3/4-inch meter cost, July 1 2026 schedule (page images read visually; transcription appended to the stored text). Missing: Quimby in-lieu ($3,880, subdivisions only), Special Tax A ($6,259.85) and B ($702.68) (nature not explained on the schedule), water meter deposit, building permit and plan check fees (separate Master Schedule of Fees not read), school fees. Searched 2026-11-09.
Water/sewer provider: City of Chino Hills (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Existing infrastructure fee, single-family impact | $11,450.00 per dwelling unit | $11,450 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1 fetched 2026-11-09, sha256 5273331117de |
| Fire facilities fee, single-family, $0.77 per sq ft x 2,000 sq ft fire · computed | $0.77 per sq ft | $1,540 | 0.77 x 2,000 = $1,540 Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1 fetched 2026-11-09, sha256 5273331117de |
| General city facilities fee, single-family, $0.95 per sq ft x 2,000 sq ft general · computed | $0.95 per sq ft | $1,900 | 0.95 x 2,000 = $1,900 Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1 fetched 2026-11-09, sha256 5273331117de |
| Housing in-lieu fee, single-family, $1 per sq ft x 2,000 sq ft (not to exceed $3,500 per unit) housing · computed | $1/sq.ft. per sq ft | $2,000 | 1 x 2,000 = $2,000 (below the $3,500 cap) Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1 fetched 2026-11-09, sha256 5273331117de |
| Parks and recreation facilities fee, single-family non-subdivision, $0.99 per sq ft x 2,000 sq ft (subdivision $0.83 per sq ft) parks · computed | $0.99 per sq ft | $1,980 | Highest printed (non-subdivision); 0.99 x 2,000 = $1,980; subdivision rate $0.83 gives $1,660 Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.1 fetched 2026-11-09, sha256 5273331117de |
| Sewer facilities fee, single-family sewer | $644.16 per dwelling unit | $644.16 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2 fetched 2026-11-09, sha256 5273331117de |
| Storm drain facilities fee, single-family stormwater | $1,758.18 per dwelling unit | $1,758.18 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2 fetched 2026-11-09, sha256 5273331117de |
| Traffic facilities impact fee, single-family, $0.79 per sq ft x 2,000 sq ft transport · computed | $0.79 per sq ft | $1,580 | 0.79 x 2,000 = $1,580 Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2 fetched 2026-11-09, sha256 5273331117de |
| Water facilities fee, single-family water | $8,944.29 per dwelling unit | $8,944.29 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.2 fetched 2026-11-09, sha256 5273331117de |
| Inland Empire Utilities Agency (IEUA) regional connection fee, residential sewer | $8,620.00 per dwelling unit | $8,620 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.3 fetched 2026-11-09, sha256 5273331117de |
| Water meter cost, 3/4-inch meter tap | $397.00 per 3/4" meter | $397 | Printed Effective 2026-07-01 Source · City of Chino Hills Development Fee Schedule effective July 1, 2026 (7/1/26 column), p.3 fetched 2026-11-09, sha256 5273331117de |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.