Phoenix, AZ
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: sales/state surcharges, Fire Life Safety plan review where required, civil/site and subdivision plan review (per project, not per home), single-family design review (hourly), and trade permits (the Table A permit fee covers all work in the valuation). Impact fees use the service area with the highest total for this home, shown on each line with the range. Tap-and-meter fee schedule on the Water Services site is dated 2008; Development Occupational Fees were adopted in 1984. The building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed.
Water/sewer provider: City of Phoenix
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Fire impact fee, single family (Paradise Ridge, Off-Project) fire | $1,165 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $1,165 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Police impact fee, single family (Paradise Ridge, Off-Project) police | $348 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $348 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Parks impact fee, single family (Paradise Ridge, Off-Project) parks | $1,474 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $1,474 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Library impact fee, single family (Paradise Ridge, Off-Project) library | $133 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $133 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Major arterials impact fee, single family (Paradise Ridge, Off-Project) transportation | $2,330 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $2,330 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Storm drainage impact fee, single family (Paradise Ridge, Off-Project) stormwater | $3,094 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $3,094 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Wastewater collection impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project) sewer | $5,127 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $5,127 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Wastewater treatment impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project) sewer | $3,753 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $3,753 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Water transmission impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project) water | $14,046 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $14,046 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Water treatment impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project) water | $4,387 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $4,387 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Water resource acquisition fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project) water | $2,009 per dwelling (Paradise Ridge Off-Project column) per dwelling unit, by service area | $2,009 | Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866. Effective 2025-06-23 Source · p.3 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area) fetched 2026-11-06, sha256 c7eadb731c42 |
| Water Development Occupational Fee, single family, inside City water | $600.00 flat per single-family residence (offsets gross impact fees; collected in addition to net assessments) | $600 | Printed Effective n/a Source · Residential Fees table fetched 2026-11-07, sha256 485e2ecd6617 |
| Sewer Development Occupational Fee, single family, inside City sewer | $600.00 flat per single-family residence (same as water DOF) | $600 | Water DOF figure also used for sewer DOF; total $1,200 Effective n/a Source · Calculating DOF Fees, example fetched 2026-11-07, sha256 485e2ecd6617 |
| Full water service (tap and meter), 3/4-inch, with paving water | $3,066 with paving ($1,779 without paving) per meter, by size | $3,066 | Printed; with-paving column used (higher; lot decides) Effective 2008-01-02 Source · Full Water Service Fee table fetched 2026-11-07, sha256 96a191d06edd |
| Building permit fee, new single family (Table A, valuation based) permit · computed | $200,001 - $1,000,000: $2,053 on first $200,000 plus $9 for each additional $1,000 by valuation | $3,682 | Valuation = building sq ft x standard rate for occupancy: 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; 181 x $9 + $2,053 = $3,682.00. ICC values from the ICC table printed in Raleigh's FY27 fee guide; Phoenix names no table (Building Official uses nationally recognized standards) Effective 2026-01-20 Source · Building Safety Permit Fees, Table A fetched 2026-11-07, sha256 4193e7420003 |
| Building plan review fee, residential valuation over $50K permit · computed | 80% of the permit fee percent of permit fee | $2,945.60 | 80% x $3,682.00 = $2,945.60 Effective 2026-01-20 Source · Building Safety Plan Review Fees, Basic Plan Review Services fetched 2026-11-07, sha256 4193e7420003 |
| Plot plan review, single-family and duplex dwellings permit | $98 per permit per permit | $98 | Printed Effective 2026-01-20 Source · Building Safety Plan Review Fees, Plot Plan Review fetched 2026-11-07, sha256 4193e7420003 |
| Total listed | $48,857.60 |
Fee-change calendar
- None recorded