PadstakeFeesMoratoriaMethodologyPricing

Phoenix, AZ

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$48,857.60listed total
18rank by 2025 new single-family permits

Not included: sales/state surcharges, Fire Life Safety plan review where required, civil/site and subdivision plan review (per project, not per home), single-family design review (hourly), and trade permits (the Table A permit fee covers all work in the valuation). Impact fees use the service area with the highest total for this home, shown on each line with the range. Tap-and-meter fee schedule on the Water Services site is dated 2008; Development Occupational Fees were adopted in 1984. The building valuation uses ICC Building Valuation Data (R-3 and U, type V-B) as printed in another city's guide, labelled computed.

Water/sewer provider: City of Phoenix

LinePrinted ratePrototypeReceipt
Fire impact fee, single family (Paradise Ridge, Off-Project)
fire
$1,165 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$1,165Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Police impact fee, single family (Paradise Ridge, Off-Project)
police
$348 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$348Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Parks impact fee, single family (Paradise Ridge, Off-Project)
parks
$1,474 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$1,474Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Library impact fee, single family (Paradise Ridge, Off-Project)
library
$133 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$133Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Major arterials impact fee, single family (Paradise Ridge, Off-Project)
transportation
$2,330 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$2,330Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Storm drainage impact fee, single family (Paradise Ridge, Off-Project)
stormwater
$3,094 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$3,094Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.1 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Wastewater collection impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project)
sewer
$5,127 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$5,127Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Wastewater treatment impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project)
sewer
$3,753 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$3,753Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Water transmission impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project)
water
$14,046 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$14,046Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Water treatment impact fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project)
water
$4,387 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$4,387Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.2 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Water resource acquisition fee, single family unit up to 1.0-inch meter (Paradise Ridge, Off-Project)
water
$2,009 per dwelling (Paradise Ridge Off-Project column)
per dwelling unit, by service area
$2,009Rule: fee depends on service area; Paradise Ridge (Off-Project), the area with the highest total for this prototype ($37,866), is used. Total ranges from $5,458 (Balance of City, On-Project) to $37,866.
Effective 2025-06-23
Source · p.3 of fee-schedules-by-land-use.pdf (Net Assessments by Fee Category, Land Use, and Service Area)
fetched 2026-11-06, sha256 c7eadb731c42
Water Development Occupational Fee, single family, inside City
water
$600.00
flat per single-family residence (offsets gross impact fees; collected in addition to net assessments)
$600Printed
Effective n/a
Source · Residential Fees table
fetched 2026-11-07, sha256 485e2ecd6617
Sewer Development Occupational Fee, single family, inside City
sewer
$600.00
flat per single-family residence (same as water DOF)
$600Water DOF figure also used for sewer DOF; total $1,200
Effective n/a
Source · Calculating DOF Fees, example
fetched 2026-11-07, sha256 485e2ecd6617
Full water service (tap and meter), 3/4-inch, with paving
water
$3,066 with paving ($1,779 without paving)
per meter, by size
$3,066Printed; with-paving column used (higher; lot decides)
Effective 2008-01-02
Source · Full Water Service Fee table
fetched 2026-11-07, sha256 96a191d06edd
Building permit fee, new single family (Table A, valuation based)
permit · computed
$200,001 - $1,000,000: $2,053 on first $200,000 plus $9 for each additional $1,000
by valuation
$3,682Valuation = building sq ft x standard rate for occupancy: 2,000 sq ft x $175.92 (ICC BVD R-3 V-B) + 400 sq ft garage x $71.07 (U V-B) = $380,268.00; 181 x $9 + $2,053 = $3,682.00. ICC values from the ICC table printed in Raleigh's FY27 fee guide; Phoenix names no table (Building Official uses nationally recognized standards)
Effective 2026-01-20
Source · Building Safety Permit Fees, Table A
fetched 2026-11-07, sha256 4193e7420003
Building plan review fee, residential valuation over $50K
permit · computed
80% of the permit fee
percent of permit fee
$2,945.6080% x $3,682.00 = $2,945.60
Effective 2026-01-20
Source · Building Safety Plan Review Fees, Basic Plan Review Services
fetched 2026-11-07, sha256 4193e7420003
Plot plan review, single-family and duplex dwellings
permit
$98 per permit
per permit
$98Printed
Effective 2026-01-20
Source · Building Safety Plan Review Fees, Plot Plan Review
fetched 2026-11-07, sha256 4193e7420003
Total listed$48,857.60

Fee-change calendar