Mesa, AZ

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$13,943listed total
78rank by 2025 new single-family permits

Not included: water service lateral and tap (customer-installed; Mesa quotes meter sets that involve a lateral), fire sprinkler and other trade extras, sales tax. Mesa prints no ICC valuation table, so the building permit uses the ICC Building Valuation Data R-3 V-B value as printed in another city's guide (labelled computed). Capacity fee amounts come from the consultant report the city's page says Council adopted on Dec 1 2025 (ordinance text not read); 3/4-inch meters pay 100% from July 1 2026. Mesa has no water, wastewater, parks, library or stormwater impact fees; only the public safety fee remains.

Water/sewer provider: City of Mesa

LinePrinted ratePrototypeReceipt
Building permit fee, new single family (includes plumbing, mechanical, electrical)
permit · computed
$200,000.01 to $500,000: $1,550.00 plus $9.00/each $1,000 or portion thereof over $200,000
by total valuation (Residential Rate Table)
$3,242Valuation = 2,000 sq ft livable x $175.92 (ICC BVD R-3 V-B, no adjustment) + 400 sq ft garage non-livable x 50% x $175.92 = $387,024.00; 188 x $1,000 over $200,000 x $9 + $1,550 = $3,242.00. ICC table value taken from the ICC Building Valuation Data as printed in Raleigh's FY27 fee guide (src 15 of j65); Mesa names ICC BVD but prints no table
Effective 2026-07-01
Source · Residential Rate Table (pp.1-2), schedule updated for July 2026
fetched 2026-11-06, sha256 475958087b27
Solid Waste Residential Development Fee, single residence
solid_waste
$311.00 Dwelling Unit
per dwelling unit
$311Printed
Effective 2026-07-01
Source · Solid Waste Residential Development Fee
fetched 2026-11-06, sha256 475958087b27
Public safety impact fee (police and fire), single-residence detached
public_safety
402.00 dwelling unit
per dwelling unit
$402Printed
Effective 2026-06-30
Source · p.2
fetched 2026-11-06, sha256 30fc1492227e
Water capacity fee, 3/4-inch meter
water
$7,719
per meter, by size (full amount from July 1 2026)
$7,719Printed; 50% phase-in ended June 30 2026
Effective 2026-07-01
Source · p.7
fetched 2026-11-07, sha256 55e202913e6b
Wastewater capacity fee, 3/4-inch meter
sewer
$1,809
per meter, by size (full amount from July 1 2026)
$1,809Printed; 50% phase-in ended June 30 2026
Effective 2026-07-01
Source · p.7
fetched 2026-11-07, sha256 55e202913e6b
Water meter installation, 0.75 inch
water
$460
per meter, by size
$460Printed (meter sets involving service laterals require a quote)
Effective 2025-02-01
Source · Utility Service Fee Schedule, Water, Meter Installation
fetched 2026-11-06, sha256 eb4aa1dc2ed9
Total listed$13,943

Fee-change calendar