Lake Havasu City, AZ
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified only, water and sewer fees only. Included: Lake Havasu City sewer treatment capacity fee (one ERU for a single family home) and 3/4-inch water meter and service line installation from the 2026 master fee schedule. Missing: building permit fees (schedule refers to the Uniform Building Code fee schedule, no amounts in the stored document), any water capacity or development impact fee (none printed), school fees. A proposed schedule effective February 1, 2027 is posted but is not in effect. Searched 2026-11-09.
Water/sewer provider: Lake Havasu City (water, sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Treatment capacity fee for sewer services (S-192), single family residential treated as one ERU, 3/4-inch meter sewer | $2,000.00 per ERU (3/4" meter) | $2,000 | Printed; all R1 single family properties are one ERU regardless of meter size Effective 2026-02-01 Source · Lake Havasu City Master Fee Schedule effective 02-01-2026 (rev. 04/29/2026), S-192 fetched 2026-11-09, sha256 544bc86bbb56 |
| Water meter and service line installation (S-131), 3/4-inch flat fee tap | $4,690.00 per 3/4" meter | $4,690 | Printed Effective 2026-02-01 Source · Lake Havasu City Master Fee Schedule effective 02-01-2026 (rev. 04/29/2026), S-131 p.7 fetched 2026-11-09, sha256 544bc86bbb56 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.