Centerton, AR

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT-TYPE FEES VERIFIED ONLY. Included: Centerton Utilities water and sewer lot assessment / capacity fees for a 3/4-inch meter (cwsdonline.myruralwater.com Rates & Fees, src 539). Missing: City of Centerton building permit schedule (only a third-party page, $50 minimum, formula not shown), plus posted connection items not included here: new construction meter/inspection $350 (3/4-inch), sewer tap $450, road bore $2,500 deposit, deposit $150. Lane A 2026-11-09.

Water/sewer provider: Centerton Utilities

LinePrinted ratePrototypeReceipt
Water lot assessment / capacity fee, 3/4-inch meter
water
$ 1,428
per meter, by size
$1,428Printed
Effective n/a
Source · Rates & Fees, Lot Assessment / Capacity Fees
fetched 2026-11-09, sha256 74c392ba5eaa
Sewer lot assessment / capacity fee, 3/4-inch meter
sewer
$ 1,363
per meter, by size
$1,363Printed
Effective n/a
Source · Rates & Fees, Lot Assessment / Capacity Fees
fetched 2026-11-09, sha256 74c392ba5eaa

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.