Centerton, AR
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT-TYPE FEES VERIFIED ONLY. Included: Centerton Utilities water and sewer lot assessment / capacity fees for a 3/4-inch meter (cwsdonline.myruralwater.com Rates & Fees, src 539). Missing: City of Centerton building permit schedule (only a third-party page, $50 minimum, formula not shown), plus posted connection items not included here: new construction meter/inspection $350 (3/4-inch), sewer tap $450, road bore $2,500 deposit, deposit $150. Lane A 2026-11-09.
Water/sewer provider: Centerton Utilities
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water lot assessment / capacity fee, 3/4-inch meter water | $ 1,428 per meter, by size | $1,428 | Printed Effective n/a Source · Rates & Fees, Lot Assessment / Capacity Fees fetched 2026-11-09, sha256 74c392ba5eaa |
| Sewer lot assessment / capacity fee, 3/4-inch meter sewer | $ 1,363 per meter, by size | $1,363 | Printed Effective n/a Source · Rates & Fees, Lot Assessment / Capacity Fees fetched 2026-11-09, sha256 74c392ba5eaa |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.