Padstake
Menu

Bryant, AR

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$3,485listed total
Nonerank by 2025 new single-family permits

Not included: Included: water impact, set-and-tap, connection and CAW system development charges for a 3/4-inch meter and wastewater impact and connection (city Water and Wastewater Fees sheet, undated; cites ordinances through 2021), residential building, electrical, mechanical and plumbing permits (2026 Budget Book Appendix 4 City Fee Schedule). Not included: meter and rental deposits ($75/$125 for 3/4-inch), gas service line ($35 per meter), road/other impact fees (none posted), grinder pump fee. Square footage assumed 2,000 heated. Fee sheet is undated: main window should confirm it is current. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Bryant

LinePrinted ratePrototypeReceipt
Water impact fee, 3/4-inch meter
water
$600
per meter, by size
$600Printed (5/8-inch also $600)
Effective n/a
Source · City of Bryant Water and Wastewater Fees sheet
fetched 2026-11-09, sha256 662dcfe87547
Water set and tap connection, 3/4-inch meter
water
$685
per meter, by size
$685Printed
Effective n/a
Source · Fee sheet, Set and Tap Connection column
fetched 2026-11-09, sha256 662dcfe87547
Water connection fee, 3/4-inch meter
water
$280
per meter, by size
$280Printed (5/8-inch: $245)
Effective n/a
Source · Fee sheet, Connection Fee column
fetched 2026-11-09, sha256 662dcfe87547
CAW system development charge, 3/4-inch meter
water
$150
per meter, by size
$150Printed
Effective n/a
Source · Fee sheet, CAW System Development column
fetched 2026-11-09, sha256 662dcfe87547
Wastewater impact fee
sewer
$500 per unit/lot
per unit or lot
$500Printed
Effective n/a
Source · Fee sheet, Residential and Commercial Wastewater
fetched 2026-11-09, sha256 662dcfe87547
Wastewater connection fee
sewer
$150 per lot/unit
per lot or unit
$150Printed
Effective n/a
Source · Fee sheet, Residential and Commercial Wastewater
fetched 2026-11-09, sha256 662dcfe87547
New residential building permit
permit · computed
14 Cents a Square Foot. $150 Minimum
per sq ft
$2800.14 x 2,000 sq ft heated = 280.00
Effective 2026-01-01
Source · 2026 Budget Book, Appendix 4 City Fee Schedule (Plan Dev)
fetched 2026-11-09, sha256 d1ace0ef9e62
Electrical, all systems new construction
permit · computed
14 Cents a Square Foot. $50 Minimum
per sq ft
$2800.14 x 2,000 = 280.00
Effective 2026-01-01
Source · 2026 Budget Book, Appendix 4
fetched 2026-11-09, sha256 d1ace0ef9e62
Mechanical, heating and cooling new construction
permit · computed
14 Cents a Square Foot Heated and Cooled. $70 Minimum
per sq ft heated and cooled
$2800.14 x 2,000 = 280.00
Effective 2026-01-01
Source · 2026 Budget Book, Appendix 4
fetched 2026-11-09, sha256 d1ace0ef9e62
Plumbing, systems for new construction
permit · computed
14 Cents a Square Foot Heated and Cooled. $40 Minimum
per sq ft heated and cooled
$2800.14 x 2,000 = 280.00
Effective 2026-01-01
Source · 2026 Budget Book, Appendix 4
fetched 2026-11-09, sha256 d1ace0ef9e62
Total listed$3,485

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.