Padstake
Menu

Mobile County Unincorporated Area, AL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$6,890listed total
Nonerank by 2025 new single-family permits

Not included: Mobile County AL (parcels served by MAWSS): 2026 capacity fees for a single family (water $280, sewer $720), water tap under 1 inch ($1,180), sewer tap flat fee ($3,200) the 5/8-inch connection fee including meter ($245) and the county all-inclusive building permit ($25 + $0.62 per sq ft of conditioned space). Alabama has no impact fee here. NOT included: plan review and revision fees, customer deposits, other water systems in the county. Page never shows a total. 2026-11-09 second pass.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water capacity fee, single family (1.00 ERC)
water
$280
per single family dwelling unit, ERC 1.00
$280Printed
Effective 2026-01-01
Source · MAWSS Fee Schedule Effective January 1, 2026, II.A Capacity Fee
fetched 2026-11-09, sha256 d405b305521a
Sewer capacity fee, single family (1.00 ERC)
sewer
$720
per single family dwelling unit, ERC 1.00
$720Printed
Effective 2026-01-01
Source · MAWSS Fee Schedule Effective January 1, 2026, II.A Capacity Fee
fetched 2026-11-09, sha256 d405b305521a
Water service line installation (tap) fee, line size under 1 inch
water
1,180
per tap, line size < 1"
$1,180Printed
Effective 2026-01-01
Source · MAWSS Fee Schedule Effective January 1, 2026, II.B Service Line Installation (Tap) Fees
fetched 2026-11-09, sha256 d405b305521a
Sewer service line installation (tap) flat fee
sewer
3,200
flat fee per sewer tap
$3,200Printed
Effective 2026-01-01
Source · MAWSS Fee Schedule Effective January 1, 2026, II.B Service Line Installation (Tap) Fees
fetched 2026-11-09, sha256 d405b305521a
Service line connection fee (includes meter), 5/8 inch, installed by MAWSS
water
245
per 5/8 inch connection
$245Printed
Effective 2026-01-01
Source · MAWSS Fee Schedule Effective January 1, 2026, II.C Service Line Connection Fee
fetched 2026-11-09, sha256 d405b305521a
Building permit, conditioned new construction, one and two family dwelling (includes building, electrical, mechanical, plumbing, roof and miscellaneous permits)
permit · computed
25 plus $0.62/square foot
per square foot of air-conditioned space; $225 minimum
$1,265$25 + $0.62 x 2,000 sq ft conditioned = 1,265.00
Effective 2026-07-01
Source · Mobile County Alabama Building Permit Fees, Exhibit A, Effective July 1, 2026, Residential Permits
fetched 2026-11-09, sha256 6fa0664ac0dc
Total listed$6,890

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.