Huntsville, AL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Huntsville AL: city sewer access fee for a 3/4-inch water meter ($1,000) and the new single-family building permit (heated x $15 + unheated x $7.50, times .0055 = $181.50). Alabama has no impact fee here. NOT included: water tap, meter, availability and capacity (Huntsville Utilities; hsvutil.org robots.txt disallows the fee page for our agent), plumbing/electrical/gas/mechanical trade permits (priced by the licensed contractor), Alabama Construction Industry Craft Training fee on commercial only. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer access fee, 3/4 inch water meter sewer | $1,000.00 per water meter size, 3/4 inch | $1,000 | Printed Effective current Source · City of Huntsville Sewer Access Fees (set by City Ordinance) fetched 2026-11-09, sha256 5db2255e9b1c |
| New single-family dwelling building permit permit · computed | Heated sq ft x $15.00 + unheated sq ft x $7.50, multiplied by .0055 percent of computed valuation | $181.50 | (2,000 x 15.00 + 400 x 7.50) x 0.0055 = 33,000 x 0.0055 = 181.50 Effective current Source · City of Huntsville Permit Costs, Residential Building Permit Cost fetched 2026-11-09, sha256 18feec5b8ba3 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.