Decatur, AL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Decatur AL: Decatur Utilities water impact 502, wastewater impact 724, water tap 450 (5/8 inch meter) and $15 setup fee, from the Residential Rate Schedule - October 2026. NOT included / not found: City of Decatur residential building permit fee (Code of Decatur Ch. 7-57.1 and 7-57.2 exist only on Municode, a closed code-hosting site), residential wastewater tap fee (only a commercial 4 inch tap seen), Morgan County fees. Page never shows a total. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 5/8 inch meter water | $502 per meter | $502 | Printed Effective 2026-10-01 Source · Decatur Utilities, Residential - Rates & Fees page (Residential Rate Schedule - October 2026), Water Impact Fees fetched 2026-11-09, sha256 41f76e901d0a |
| Wastewater impact fee, 5/8 inch meter sewer | $724 per meter | $724 | Printed Effective 2026-10-01 Source · Decatur Utilities, Residential - Rates & Fees page (Residential Rate Schedule - October 2026), Wastewater Impact Fees fetched 2026-11-09, sha256 41f76e901d0a |
| Water tapping fee, 5/8 inch meter water | $450 per meter | $450 | Printed Effective 2026-10-01 Source · Decatur Utilities, Residential - Rates & Fees page (Residential Rate Schedule - October 2026), Water Tapping Fees fetched 2026-11-09, sha256 41f76e901d0a |
| Setup fee per meter water | $15 per meter | $15 | Printed Effective 2026-10-01 Source · Decatur Utilities, Residential - Rates & Fees page (Residential Rate Schedule - October 2026), Fees fetched 2026-11-09, sha256 41f76e901d0a |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.